Publication No. 5105703
16
Fig. 18
Installation
PRF0019A
Air/Flue Duct
Assembly
Wing
Nuts
(4 off)
Adjustment
Screw
PRF0020A
Remove
Transportation
Foot
Leg
Securing
Screw
PRF0021A
2.7.
Install the Boiler
Lift the boiler onto its mounting bracket.
Locate the studs on the air duct flange
through the boiler casing and secure using
four wing nuts (accessory pack F).
Position boiler on its mounting bracket so
that the sides of the boiler line up with the
reference lines ‘C’ on the rear wall.
Undo the two screws securing the
transportation foot and discard foot. Vertical
alignment with rear wall can be corrected
using the adjustment screws at the rear of
the boiler.
Rotate the left hand adjustment screw to
align one of the holes in the base plate with
hole ‘D’ in the wall. Working through the hole
in the leg, secure the base plate to the wall
using the screw from accessory pack D.
Make good the wall surface around the flue
terminal.
Fit optional terminal wall plate if required.
Fig. 17
Fig. 16