background image

 INSTALLATION MANUAL: PAD100-DUCTR ANALOG ADDRESSABLE DUCT DETECTOR

Document 5406321-A  05/16

Potter Electric Signal Company, LLC           •           St. Louis, MO             •           Phone: (800) 325-3936               •            www.pottersignal.com

 

PAGE 3 OF 5

Figure 4. Example of Wiring a PAD100-DRTS

Figure 5. 

Example of Wiring a MS-RA

Figure 6. 

Example of Wiring a MS-KA/P/R

Notes:

• 

SLC wiring style supports the Class A, Class X and Class B.

• 

SLC loop wiring and Aux PWR wiring are power limited and supervised.

• 

All wiring is between #12 (max.) and #22 (min.).

• 

Wire Preparation – Strip all wires 1/4 inch from their edges as shown here: 

– Stripping too much insulation may cause a ground fault.

– Stripping too little may cause a poor connection and subsequently an open circuit.

1/4 inch

24VDC FROM FACP OR

PREVIOUS MODULE

FORM C RELAY

10A, 250VAC

TO NEXT MODULE

FROM FACP OR

PREVIOUS MODULE

Note: Jumper must be 

in “Off” position when 

using the MS-KA/P/R.

24VDC TO FACP OR

NEXT MODULE

TO MS-RA (RED WIRE)
TO MS-RA (BLACK WIRE)

SUPERVISION OPTION

SHOWN IN “OFF” POSITION

FORM C RELAY

10A, 250VAC

TO NEXT MODULE

FROM FACP OR

PREVIOUS MODULE

PAD100-DRTS 

SUPERVISION OPTION

TO PAD100-DRTS

Note: Keep jumper in

“On” position when 

using the PAD100-DRTS

for full wiring supervision.

24VDC FROM FACP OR

PREVIOUS MODULE
24VDC TO FACP OR

NEXT MODULE

24VDC FROM FACP OR

PREVIOUS MODULE

FORM C RELAY

10A, 250VAC

TO NEXT MODULE

FROM FACP OR

PREVIOUS MODULE

Note: Jumper must be 

in “Off” position when 

using the MS-KA/P/R.

24VDC TO FACP OR

NEXT MODULE

RED

RED

BLACK

KEY SWITCH

MS-KA/P/R

ALARM LED

PILOT LED

BLACK

BLACK

BLACK

SUPERVISION OPTION

SHOWN IN “OFF” POSITION

firealarmresources.com

Содержание PAD100-DUCTR

Страница 1: ...Sampling tubes are supplied in three standard lengths 2 5 ft 5 ft and 10 ft and cut to size to fit the duct Mounting the duct smoke unit is accomplished by the use of a template and 2 sheet metal screws which are provided Mounting can be achieved without the removal of the clear cover which is secured by 4 capture screws 2 Setting the Address All PAD protocol detectors and modules require an addre...

Страница 2: ...uct Detector Model PAD100 DUCTR Operating Voltage 24 0V Current Draw 500μA Detector Head Model PAD100 DD Detector Head Type Photoelectric Sensitivity Test Method Self diagnostic test Air Velocity 100 to 4000 ft min Ambient Temperature 32 to 120 F 0 to 49 C Humidity 10 to 85 Relative humidity non condensing Housing Material Plastic backbox clear plastic cover Finish Gray backbox with clear cover Di...

Страница 3: ...ircuit 1 4 inch 24VDC FROM FACP OR PREVIOUS MODULE FORM C RELAY 10A 250VAC TO NEXT MODULE FROM FACP OR PREVIOUS MODULE Note Jumper must be in Off position when using the MS KA P R 24VDC TO FACP OR NEXT MODULE TO MS RA RED WIRE TO MS RA BLACK WIRE SUPERVISION OPTION SHOWN IN OFF POSITION FORM C RELAY 10A 250VAC TO NEXT MODULE FROM FACP OR PREVIOUS MODULE PAD100 DRTS SUPERVISION OPTION TO PAD100 DRT...

Страница 4: ...e duct detector should not be mounted in areas of extreme high or low temperatures in areas where high humidity exists or in areas where the duct may contain gases or excessive dust SAMPLING TUBE ASSEMBLY The PAD100 DUCTR duct smoke detectors employ a specially notched sampling tube which may be ordered separately in one of four 4 standard lengths STN 1 0 For duct widths of 6 TO 1 0 STN 2 5 For du...

Страница 5: ...nds Note When a panel is configured to not flash LEDs the LEDs on the detectors will not flash at any time 7 Functional Testing Note Be sure to dis engage all alarm signal services releasing devices and extinguishing systems prior to performing the following test except automatic testing by the FACP Be sure to re engage these systems when all testing is complete 8 Walk Test The FACP must be placed...

Отзывы: