Step 7:
Next, take one of the remaining
connectors from the battery
splitter loom and plug it into the
1C0L.
Step 8:
Next, take the remaining connector
from the battery splitter loom and
connect it to the batteries.
Step 9:
Finally, take the orange wire from
the 1C0L and connect it to the
orange wire from the PS800
controller.
Now connect the single end of
the battery splitter loom to the
PS800 controller.
Step 6:
For more information visit: www.portlandlighting.co.uk
Portland Lighting
Ltd
Unit 2 Reedswood Park Road,
Walsall, WS2 8DQ
Email: [email protected]
Telephone: 01922 72
11
33
The final image shows the
Trough Light at our partner
Zeta’s headquarters
9.
8.
7.
6.
Next, connect the 1C0L to 1 of
the pairs of PV, via the splitter
loom you connected in step 1.
Step 3:
Step 4:
Next, connect the PS800
controller to the other pair of PV
(as shown in image 4).
Step 5:
Then connect the trough light to
the PS800 controller, as shown.
3.
5.
4.