17
6.
CENTER-ROLL
®
BATTEN TUBE
All splice locations and rivet fasteners are to be inspected for structural integrity. Ensure the splices are tight with no noticeable free play
between the batten tubes. Inspect each splice rivet for a tight secure connection and for flush fit with batten tube. In addition, carefully
inspect the rivets securing the motor drive to the batten tube, also checking that the rivets are tight with no free play or protrusions.
7.
UPPER AND LOWER CURTAIN SUPPORT TUBES
Inspect both upper and lower support tubes (inside curtain pockets), ensuring that the tubes are in line and not separating at the splice
locations. Ensure that the lower support tube is secured to the bottom pocket at each end. Make sure the screws are in place and that the
tube is approximately flush with the fabric edge at each end. A pipe cap should also be in place at each end of the lower support tube to
prevent damage to the curtain fabric.
8.
CURTAIN FABRIC
Inspect the curtain for tears or holes in the fabric. Additional fabric can be supplied for patching purposes. Industrial vinyl cement can be
used to bond the patches to the curtain. Also, check the fabric for signs of tearing or separation at the heat-sealed seams. With each fabric
panel, ensure the cable is fully inserted in the pocket, and that the cable ends are not overhanging from batten tube. The fabric panels
should never overhang from the batten tube ends. The fabric panels should always be flush or inside the batten tube ends.
9.
CONTRACT MAINTENANCE ALTERNATIVE
In many facilities, it is possible that the maintenance personnel either do not have the ability or the scaffold to work at the heights required
to perform the inspection and maintenance program outlined in this manual. Should your maintenance program be so limited that this
program cannot be properly performed, it is highly recommended that a contract type inspection/ maintenance service program be initiated
with a qualified and trained establishment in this type of equipment.
Содержание Center-Roll 2081
Страница 18: ...18 WIRING AT WINCH IMPORTANT NOTE WIRING AT WALL MOUNTED KEY SWITCH IMPORTANT NOTE CAUTION SUBSTITUTION X Y...
Страница 21: ...21 INSTALLER NOTES...
Страница 22: ...22 INSTALLER NOTES...
Страница 23: ...23 INSTALLER NOTES...