background image

SAVE

FOR

FUTURE

USE

7 3 0 1 3 7 5 - 1 0 0   R e v .   B

Product names listed herein are trademarks of Porcher
© Porcher 2009

   

CAUTION:  PRODUCT IS FRAGILE.  TO AVOID BREAKAGE AND POSSIBLE INJURY HANDLE WITH CARE!

 

!

NOTE:  

Pictures may not exactly define contour of china and components.

RECOMMENDED TOOLS AND MATERIALS

Putty Knife
Closet Bolts

Regular Screwdriver
Wax Ring/Gasket

Adjustable Wrench
Flexible Supply Tube

Sealant
Hacksaw

Carpenters Level
Tape Measure

2

CLOSET 

FLANGE

CLOSET

BOLTS

A

ROUGHING-IN DIMENSIONS:  

NOTE: 

 Distance from wall to closet flange centerline must be as listed below:

3

Recommended fitting type for back-to-back installations.

Depending upon your plumbing and venting conditions, the flow from 
the Champion in a back-to-back installation may create a vacuum on 
the system and draw water from the opposing bowl.  The National 
Standards Plumbing Code prohibits the use of a cross fitting for 
drainage as throw over is possible.  The code does approve a 
directional "Y" style fitting with proper venting to direct the water 
downward and away from the other toilet.

NOTE: BACK-TO-BACK INSTALLATION

1

INSTALL CLOSET BOLTS

Install closet bolts in flange 
channel, turn 90°, and slide into 
place 6" (152mm) apart and 
parallel to wall.

Thank you  for selecting Porcher - the benchmark of fine quality.  To ensure this product is installed properly, please read these instructions 
carefully before you begin. (Certain installations may require professional help.) Also be sure your installation conforms to local codes.

VENETO

®

 SERIES

Model 97320 Elongated One Piece Toilet 
Featuring Champion®4 Technology and Slow Close Seat

5

INSTALL WAX SEAL

Invert toilet on floor (cushion to prevent 
damage), and install wax ring evenly around 
waste flange (horn), with tapered end of ring 
facing toilet.  Apply a thin bead of sealant 
around toilet base.

POSITION TOILET ON FLANGE

a. 

Unplug floor waste opening and install toilet on closet 

        flange so bolts project through mounting holes.
b. 

Loosely install retainer washers and nuts. Side of 

 

washers marked "THIS SIDE UP" 

must 

face up!

4

WAX RING

CLOSET

BOLT

NUT

TAPERED
WASHER

 FLANGE

OPENING

SEALANT

IMPORTANTE: Se requiere suministro de agua en la pared en 3-3/4 pulg. ó 9 pulg. desde la línea central 
del inodoro (consulte la sección de preparación). La primera posición sugerida es oculto detrás del inodoro. 
La geometría del inodoro otorga espacio para esta instalación. La segunda posición sugerida es a un 
costado del inodoro. Entre estas dos posiciones, el espacio para el suministro entre la pared y el inodoro 
se limita a 4-1/8 pulg. En este caso, revise el suministro y las dimensiones de la manguera. 

1± 1/4" (± 256mm)

 

12"

(305mm)

L/C DE DESAGÜE Y PERNOS 

DE MONTAJE DEL INODORO

27-7/8"

(708mm)

PARED TERMINADA

28-7/8"

(733mm)

7-1/16" 

(179mm)

7" 

(178mm)

15-3/8" 

(391mm)

15" 

(381mm)

11/16" 

(17mm)

18-7/16" 
(469mm)

L/C DE AGUJEROS 
DE MONTAJE DEL 
ASIENTO 5-1/2 
PULG. (140 mm) 
CENTRALES

4-1/8

"

(105mm)

SUMINISTRO

SEGÚN SE
REQUIERA

(posición 1 o

posición 2)

C/L

9-9/16" 

(243mm)

9" 

(229mm)

3-3/4"

(95mm)

PISO
TERMINADO

13-15/16" 

(353mm)

a.  Close toilet supply valve and flush tank completely. Towel 
or sponge remaining water from tank and bowl.

b.  Disconnect and remove supply line.  

     NOTE:

 If replacing valve, first shut off main water supply!

c.  Remove old mounting hardware, remove toilet and plug 
floor  waste opening to prevent escaping sewer gases.

d.  Remove closet bolts from flange and clean away old wax, 
putty, etc. from base area.

NOTE:

 

Mounting surface must be clean and level 

before

 

new toilet is installed!

REMOVE OLD TOILET

INSTALLATION INSTRUCTIONS

CARE AND MAINTENANCE

Отзывы: