SAVE
FOR
FUTURE
USE
7 3 0 1 3 7 5 - 1 0 0 R e v . B
Product names listed herein are trademarks of Porcher
© Porcher 2009
CAUTION: PRODUCT IS FRAGILE. TO AVOID BREAKAGE AND POSSIBLE INJURY HANDLE WITH CARE!
!
NOTE:
Pictures may not exactly define contour of china and components.
RECOMMENDED TOOLS AND MATERIALS
Putty Knife
Closet Bolts
Regular Screwdriver
Wax Ring/Gasket
Adjustable Wrench
Flexible Supply Tube
Sealant
Hacksaw
Carpenters Level
Tape Measure
2
CLOSET
FLANGE
CLOSET
BOLTS
A
ROUGHING-IN DIMENSIONS:
NOTE:
Distance from wall to closet flange centerline must be as listed below:
3
Recommended fitting type for back-to-back installations.
Depending upon your plumbing and venting conditions, the flow from
the Champion in a back-to-back installation may create a vacuum on
the system and draw water from the opposing bowl. The National
Standards Plumbing Code prohibits the use of a cross fitting for
drainage as throw over is possible. The code does approve a
directional "Y" style fitting with proper venting to direct the water
downward and away from the other toilet.
NOTE: BACK-TO-BACK INSTALLATION
1
INSTALL CLOSET BOLTS
Install closet bolts in flange
channel, turn 90°, and slide into
place 6" (152mm) apart and
parallel to wall.
Thank you for selecting Porcher - the benchmark of fine quality. To ensure this product is installed properly, please read these instructions
carefully before you begin. (Certain installations may require professional help.) Also be sure your installation conforms to local codes.
VENETO
®
SERIES
Model 97320 Elongated One Piece Toilet
Featuring Champion®4 Technology and Slow Close Seat
5
INSTALL WAX SEAL
Invert toilet on floor (cushion to prevent
damage), and install wax ring evenly around
waste flange (horn), with tapered end of ring
facing toilet. Apply a thin bead of sealant
around toilet base.
POSITION TOILET ON FLANGE
a.
Unplug floor waste opening and install toilet on closet
flange so bolts project through mounting holes.
b.
Loosely install retainer washers and nuts. Side of
washers marked "THIS SIDE UP"
must
face up!
4
WAX RING
CLOSET
BOLT
NUT
TAPERED
WASHER
FLANGE
OPENING
SEALANT
IMPORTANTE: Se requiere suministro de agua en la pared en 3-3/4 pulg. ó 9 pulg. desde la línea central
del inodoro (consulte la sección de preparación). La primera posición sugerida es oculto detrás del inodoro.
La geometría del inodoro otorga espacio para esta instalación. La segunda posición sugerida es a un
costado del inodoro. Entre estas dos posiciones, el espacio para el suministro entre la pared y el inodoro
se limita a 4-1/8 pulg. En este caso, revise el suministro y las dimensiones de la manguera.
1± 1/4" (± 256mm)
12"
(305mm)
L/C DE DESAGÜE Y PERNOS
DE MONTAJE DEL INODORO
27-7/8"
(708mm)
PARED TERMINADA
28-7/8"
(733mm)
7-1/16"
(179mm)
7"
(178mm)
15-3/8"
(391mm)
15"
(381mm)
11/16"
(17mm)
18-7/16"
(469mm)
L/C DE AGUJEROS
DE MONTAJE DEL
ASIENTO 5-1/2
PULG. (140 mm)
CENTRALES
4-1/8
"
(105mm)
SUMINISTRO
SEGÚN SE
REQUIERA
(posición 1 o
posición 2)
C/L
9-9/16"
(243mm)
9"
(229mm)
3-3/4"
(95mm)
PISO
TERMINADO
13-15/16"
(353mm)
a. Close toilet supply valve and flush tank completely. Towel
or sponge remaining water from tank and bowl.
b. Disconnect and remove supply line.
NOTE:
If replacing valve, first shut off main water supply!
c. Remove old mounting hardware, remove toilet and plug
floor waste opening to prevent escaping sewer gases.
d. Remove closet bolts from flange and clean away old wax,
putty, etc. from base area.
NOTE:
Mounting surface must be clean and level
before
new toilet is installed!
REMOVE OLD TOILET
INSTALLATION INSTRUCTIONS
CARE AND MAINTENANCE