7 7 010 3 - 10 0 Rev. D
Installation Instructions for Floor Standing Vanity & Dresser
Hanger or Cleat
Location
C/L of 2 x 6
Support
and Bracket
Finished
Floor
NOTE:
The OPEN AREA at the rear of the vanity is
provided for water supplies and drain. Verify that supplies
and drain are accommodated by this cut-out.
22"
(559mm)
MOLDING
SPACER
2
If applicable, remove the top from the vanity.
Move the vanity into place and anchor it to the wall through at least 2 of the mounting holes or angle
brackets (in some models) in the rear of the vanity.
Install vanity top, sink and faucet in accordance with manufacturer’s instructions.
NOTE:
Legs must be used when Cabinet and Base are combined to create a Floor Standing Vanity.
Stack and align Cabinet 80800-00 atop of the Base with legs
80810-00. Secure using four screws (not supplied). Use one
#6 x 1/4" drywall screw in each corner.
Provide suitable reinforcement required for anchoring
the vanity to the wall. Install a 2 x 6 cross-brace between
wall studs.
Determine horizontal centerline location of mounting
hardware required to support vanity and wall mounted sinks.
See illustration.
If molding is present and prevents installation of the vanity
flush against the wall, notch the molding and/or provide
suitable spacer for a secure installation.
See illustration.
- 7 -
1