background image

l i n e

 

P R E S T I G E

4/16

RAIL MOUNTING

6160

8800

RAIL MOUNTING

Ø4,2mm

 

6160

8480

8030

 

8480 - Ø5x60 (120)

Ø8mm

PARTS:

8030 - Ø8x60 (120)

8800 - Ø4,2x10

6160 - Ø12

6160

Содержание PRESTIGE P7

Страница 1: ...l i n e P R E S T I G E 7 9 Manual Installation of Pool Enclosure P7 P9 two sided rail two sided rail INSTALLATION MANUAL FOR POOL COVER MODEL PRESTIGE P7 P9 TWO SIDED RAIL...

Страница 2: ...l i n e P R E S T I G E 2 16 A Xs Xr RAIL SEGMENT D 1 D 2 WIDTH OF SMALLEST SEGMENT POOL COVER POSITION D1 D2 Xs Xr COVER POSITION...

Страница 3: ...l i n e P R E S T I G E 3 16 RAIL POSITION M RIGHT POOL LEFT RAILS POSITION...

Страница 4: ...l i n e P R E S T I G E 4 16 RAIL MOUNTING 6160 8800 RAIL MOUNTING 4 2mm 6160 8480 8030 8480 5x60 120 8mm PARTS 8030 8x60 120 8800 4 2x10 6160 12 6160...

Страница 5: ...l i n e P R E S T I G E 5 16 INSTALLATION OF SEGMENTS INSTALLATION OF SEGMENTS...

Страница 6: ...TILTING SEAL 1 2 3 4 N 2 N PARTS 35 38 COLLECTING AND GUIDING ELEMENTS P7 P9 TWO SIDED RAIL FIXED FACADE TILTING SEAL 8800 4x10 1200 1200 8800 8800 N NUMBER OF SEGMENTS N 1 8580 6 3x38 5000 5000 5000...

Страница 7: ...ING AND GUIDING ELEMENTS P7 P9 TWO SIDED RAIL DOORS FACADE 8800 4x10 1200 1200 8800 8800 N NUMBER OF SEGMENTS N 1 7 12 8580 6 3x38 1850 1850 8580 1865 8580 1865 8580 5000 5000 5000 5000 8580 8580 8580...

Страница 8: ...i n e P R E S T I G E 8 16 INSTALLATION OF SHOCK ABSORBER HOLDER P7 P9 ONLY AT DOORS FACADE 1850 1851 8580 INSTALLATION OF SHOCK ABSORBER HOLDER P7 P9 ONLY AT DOORS FACADE PARTS 1850 1851 8580 6 3 x 3...

Страница 9: ...l i n e P R E S T I G E 9 16 PLACING OF COLLECTING ELEMENTS P7 P9 ONLY AT DOORS FACADE 1865 8580 PLACING OF COLLECTING ELEMENTS P7 P9 ONLY AT DOORS FACADE 1865 8580 6 3 x 38 PARTS...

Страница 10: ...l i n e P R E S T I G E 10 16 PLACING OF COLLECTING ELEMENTS FACADE P7 P9 ONLY AT DOORS FACADE 1860 8810 PLACING OF COLLECTING ELEMENTS FACADE P7 P9 ONLY AT DOORS FACADE PARTS 1860 8810 4 x 12...

Страница 11: ...l i n e P R E S T I G E 11 16 INSTALLATION OF LOCKING BOLT 1 2 1 mm PARTS 1220 1230 1220 M16 x 1 5 1210 M12 x 1 5 INSTALLATION OF LOCKING BOLT...

Страница 12: ...n e P R E S T I G E 12 16 INSTALLATION OF FIXING PYRAMID WITHOUT HELPING TOOL DRILL 4 2mm 1265 8800 26 0 10 mm DRILL 5 2mm INSTALLATION OF FIXING PYRAMID WITHOUT HELPING TOOL PARTS 1265 8800_ 4 0 x 10...

Страница 13: ...l i n e P R E S T I G E 13 16 INSTALLATION OF FIXING PYRAMID OPTION DRILL 5 2mm DRILL 4 2mm 1265 8800 INSTALLATION OF FIXING PYRAMID OPTION PARTS 0105 1265 8800_ 4 0 x 10...

Страница 14: ...l i n e P R E S T I G E 14 16 PLACING OF STOP ELEMENTS FOR SEGMENTS 2 1200 3 2mm 8840 PLACING OF STOP ELEMENTS FOR SEGMENTS 1 2 8840 3 x 10 PARTS 1200...

Страница 15: ...l i n e P R E S T I G E 15 16 PLACING OF BLIND PLUG OF RAIL M 6320 6330 6340 PLACING OF BLIND PLUG OF RAIL PARTS 6320 6330 6340 L R...

Страница 16: ...l i n e P R E S T I G E 16 16 INSTALLATION OF HANDLE 200 mm 35 mm 5 2 mm 5000 8580 5000 6 3 x 38 INSTALLATION OF HANDLE PARTS 5000...

Отзывы: