7
5.
UV REACTOR
It is imperative that you read all the instructions in this manual before
operating the reactor.
Before starting the installation, please wear protective gloves.
5.1.
Pre-assembly
Assembling the base
-
Fit the base to the lower part of the reactor
-
Using a 5 mm Allen key, fit the 4 screws as shown in the figure opposite
Assembling the fittings
-
Using PVC glue, fit the fittings that came with the unit to the reactor inlet and
outlet
-
If necessary, fit and glue the reducers corresponding to the diameter of the pipe
onto each of the fittings.
Under no circumstances should the reactor body be dismantled. The nuts at the four corners of the reactor must
never be loosened as the reactor may start to leak. Any tampering with these nuts could result in the warranty
being voided.
5.2.
Installation
-
For ease of maintenance, we recommend using a bypass.
-
The reactor must be installed in a vertical position (water inlet at the bottom)
Upstream valve
Downstream
valve
850 mm
Bypass valve
Union fitting 75
250 mm
Содержание JUSTSALT UV 15
Страница 92: ......