27
A ntenna
(2)
Insert the 4G SIM card (Optional).
(3)
Put all the covers back on the unit and screw tightly (Torque: 1.2 N·m).
Safety Check
DANGER: Check thoroughly, all operations in the installation, ensuring the
system is installed correctly. Pay special attention that DC voltages are in
the specified ranges of Mega.
Items
Notes
Wiring
All cables are wired tightly.
Wiring box covers
All wiring covers are screwed tightly.
Conduit
All conduits are tightly installed and sealed.
Wire protection
Insulated cover of wires is not at risk of being cut
or damaged.
SIM Card
Содержание PBT-LI409100S2
Страница 1: ...Mega Storage User Manual Published in January 2022 ...
Страница 3: ...Legal Rights 37 Service 37 ...
Страница 23: ...20 4 Plug all battery modules into the cabinet and fasten with M5 10 screws ...
Страница 25: ...22 2 Connect battery modules in series in sequence of 1 to 10 as listed below 1 2 4 5 3 ...
Страница 41: ...38 becomes necessary to return the device for repair contact your local distributor for more information ...