PH03 Comfort Inn - September 2008
Page 8 of 12
19”
11”
17-1/2”
11”
Step 5. Waste Tank Installation
On the outside of the unit someone will measure and mark drill spots. For the rear wall panel measure from the inside
edge of the rib in 11” and up from the top
of the base surround 17-1/2” and mark with
a marker. For the corner molding measure
in the center of each side of the rib and up
from the top of the base surround and mark
at 19”. On the left wall panel measure from
the inside edge of the rib in 11” and up from
the top of the base surround and mark at 19”.
Position the waste tank in the left rear corner
on the tank supports of the base surround.
While inside one person pushes the tank
against the wall panels and corner, using a
13/64” bit, someone on the outside will drill
through the four spots just marked.
CAU-
TION:
WHEN DRILLING HOLES, ESPECIALLY
THE REAR PANEL, BE SURE TO DRILL ONLY
THROUGH THE FIRST WALL OF THE TANK.
Rivet into the holes using (4) PC-000103 riv-
ets from the outside with (4) PC-000106 back-
up washers on the inside of the tank.
PC-000103 Rivet
4 Used in this step
PC-000106 Washer
4 Used in this step
PC-000102 Rivet
4 Used in this step
PC-000106 Washer
36 Used in this step
PC-000100 Rivet
36 Used in this step
26-1/2”
There are three 24” grab bars and three sup-
port rails for the grab bars. The side panels use
the same size support rail. The rear panel uses
a shorter size rail.
IMPORTANT:
THE ENDS OF
THE SUPPORT RAILS ARE BENT TO MATCH THE
ANGLES OF THE CORNER MOLDINGS. BE SURE
THE THREE HOLE PATTERN CLOSEST TO THE
END IS TOWARDS THE LEFT REAR CORNER.
From inside of the restroom measure and posi-
tion the support rail at 26-1/2” up from the top
of the base surround for each panel. At the 26-
1/2” position, the support rails will be used as
drill guides. Using a 13/64” drill bit, drill through
the pre-drilled holes of the rails into the wall
panels. Rivet through the drilled holes with (36)
PC-000100 rivets and (36) PC-000106 back-up
washers.
NOTE:
(
All rivets must be riveted from the inside with washers on the outside.)
The left and right support rails
have additional bends on one end to fasten to the aluminum door jamb. There will be two holes in the rails along
the door jamb, these holes will be drilled only through the fi rst wall of the door jamb, using (4) PC-000102 rivets.
Step 6. Support Rails Installation