
5. Preparation for installation
6
GAPID SENSOR
5.1 Preparing the components before installation
Since the communication between the sensors takes place by wire, it is advisable to firstly check that
all sensor components and any accessories are present before beginning the installation.
5.2 It is advisable to carry out
:
•
the installation of the sensors on the perimeters to be protected;
•
checking the functioning of the sensor programs
•
the permanent fixing of each sensor;
•
the preparation and carrying out of electrical connections.
In order to avoid errors, operating and installation problems, it is advisable to proceed as follows:
a) Place all the products with the package open on a table;
b) Test the functioning of the sensors;
c) Arrange (without fixing) the sensors in the planned points;
d) Check that each sensor responds from the application;
e) Permanently fix the sensors.
Before proceeding with the installation, it is necessary to check the integrity of the product, the
adequacy of the model chosen and the suitability of the environment intended for installation:
• Check that all conditions of use fall within the "limits of use" and in the "Technical specifications of
the product".
• Check that the environment chosen for the installation is compatible with the total footprint of the
product.
• Check that the surface chosen for the installation of the product is sturdy so as to ensure stable
fixing and that it is adequately protected against possible impacts or the elements.
POLITEC | INSTALLATION MANUAL - VER.2.3