67
MAINTENANCE
Spring Pre-Load Adjustment (cont.)
5. Subtract the second measurement from the first. The resulting
number is called “sag,” and should be between 0.5 and 1.0
inches. If it’s not, the pre-load must be adjusted.
6. After adjusting your spring pre-load ring, repeat the
measurement procedure until the sag is between 0.5 to 1.0
inches. If the proper sag cannot be obtained, the motorcycle
may be overloaded. Consult your Victory dealer for additional
assistance.