7.10
9925724 R01 - 2014-2015
RZR
XP 1000 /
RZR
XP4 1000 Service Manual
© Copyright 2014 Polaris Industries Inc.
6.
Torque wheel hub nut to specification and install a
new
cotter pin
5
. Tighten nut slightly if necessary to
align cotter pin holes.
Hub Castle Nut:
110 ft-lbs (149 Nm)
7.
Install wheel and four wheel nuts. Torque wheel nuts
to specification.
Wheel Nuts:
120 ft-lbs (163 Nm)
8.
Rotate wheel and check for smooth operation. Bend
both ends of cotter pin around end of spindle in
different directions.
FINAL DRIVE
Содержание RZR XP 1000
Страница 4: ......
Страница 6: ......
Страница 415: ...9 9 17 9925724 R01 2014 2015 RZR XP 1000 RZR XP4 1000 Service Manual Copyright 2014 Polaris Industries Inc BRAKE SYSTEM ...
Страница 416: ...9 18 9925724 R01 2014 2015 RZR XP 1000 RZR XP4 1000 Service Manual Copyright 2014 Polaris Industries Inc BRAKE SYSTEM ...
Страница 525: ...2014 RZR XP 1000 Chassis ...
Страница 526: ...2014 RZR XP 1000 Chassis ...
Страница 527: ...2014 RZR XP4 1000 Chassis ...
Страница 528: ...2014 RZR XP 1000 XP4 1000 Box ...
Страница 529: ...2014 RZR XP 1000 INT L Chassis ...
Страница 530: ...2014 RZR XP 1000 INT L Chassis ...
Страница 531: ...2014 RZR XP 1000 INT L Box ...
Страница 532: ...2015 RZR XP4 1000 Chassis ...
Страница 533: ...2015 RZR XP4 1000 Chassis ...
Страница 534: ...2015 RZR XP 1000 Chassis ...
Страница 535: ...2015 RZR XP 1000 Chassis ...
Страница 536: ...2015 RZR XP 1000 XP4 1000 Box ...
Страница 537: ...2015 RZR XP 1000 INT L Chassis ...
Страница 538: ...2015 RZR XP 1000 INT L Chassis ...
Страница 539: ...2015 RZR XP 1000 INT L Box ...