3
3.75
9925723 R01 - 2015
RZR
900 Service Manual
© Copyright 2014 Polaris Industries Inc.
11. Install the valve tappet
8
for each valve in the order
they were removed.
NOTE: Oil the tappet prior to installing.
If any valve train components were replaced,
refer to Valve Clearance Adjustment, page 3.82.
Valve Sealing Test
1.
Clean and dry the combustion chamber area
1
.
2.
Pour a small amount of clean solvent into each
intake port
2
and check for leakage around the
valves. The valve seats should hold fluid with no
seepage.
3.
Repeat for exhaust valves by pouring fluid into each
exhaust port
3
.
ENGINE / COOLING SYSTEM
Содержание 2015 RZR 900 XC Edition
Страница 4: ......
Страница 6: ......
Страница 66: ...2 38 9925723 R01 2015 RZR 900 Service Manual Copyright 2014 Polaris Industries Inc NOTES MAINTENANCE ...
Страница 75: ...3 3 9 9925723 R01 2015 RZR 900 Service Manual Copyright 2014 Polaris Industries Inc ENGINE COOLING SYSTEM ...
Страница 269: ...6 6 31 9925723 R01 2015 RZR 900 Service Manual Copyright 2014 Polaris Industries Inc TRANSMISSION ...
Страница 364: ...9 12 9925723 R01 2015 RZR 900 Service Manual Copyright 2014 Polaris Industries Inc Parking Brake Caliper BRAKE SYSTEM ...
Страница 438: ...11 36 9925723 R01 2015 RZR 900 Service Manual Copyright 2014 Polaris Industries Inc EPS Break Out Diagram ELECTRICAL ...
Страница 452: ......
Страница 453: ......
Страница 454: ......
Страница 455: ......
Страница 456: ......
Страница 457: ......