background image

HCI3500 

07 June 2018 

 

 

 

         

 

     1. Installation Procedure

1-6

A

Screws to use

NOTE!

 If the upstream device has a decurler installed, the 

Decurler Paper 

Guide

 has to be used: follow the steps 6 to 8 of this procedure.

If the upstream device does not have a decurler installed, follow steps 1 to 

5 instead.

6.  Place Decurler Paper Guide as shown
7.  Use screws [A] (2X) -”M6S M 3x5” to fasten Decurler Paper Guide.

1.2.2 

Mount Upstream Sheet Guides or Decurler Paper Guide (continued)

1.2 

HCI3500 Installation, Continued

D

E

8.  Adjust Decurler unit to have paper path aligned. Slots [D] (2X) are 

there to facilitate this operation, as they are exactly in the center of the 

paper path [E].

Содержание HCI3500

Страница 1: ...x17162C 07 June 2018 HCI3500 Installation Instruction...

Страница 2: ...2 4 Disconnect Power Install Termination Plugs and Cable Protection 1 7 1 2 5 Adjust Machine Height 1 8 1 2 6 Mount Upstream Grounding Plate 1 9 1 2 7 Mount Downstream Grounding Plate 1 10 1 2 8 Dock...

Страница 3: ...chine and easily accessible Make sure the plug is firmly inserted in the outlet 2 Avoid multi wiring 3 Be sure to ground the machine 4 Never place anything on the power cord Universal Power Supply 100...

Страница 4: ...C13 4 5m Accessories box 7 1 Termination Plug Female Accessories box 8 1 Termination Plug Male Accessories box 9 1 Spanner 24mm Front of the machine 10 1 USB to STM32F Dongle Rear of the machine 11 1...

Страница 5: ...1 Cable Protection Accessories box 21 4 Paper Support Accessories box 22 1 Decurler Paper Guide Accessories box 23 2 Foot Accessories box 24 4 Screw M6SF T20 M4x10 Accessories box 25 2 Screw M6SF TT M...

Страница 6: ...se screws A 2X M6S M 3x5 to fasten Upstream Sheet Guides 3 If the HCI is being installed to a Buffer unit follow steps number 4 and 5 as well otherwise skip to 1 2 3 4 If the HCI is being installed to...

Страница 7: ...e does not have a decurler installed follow steps 1 to 5 instead 6 Place Decurler Paper Guide as shown 7 Use screws A 2X M6S M 3x5 to fasten Decurler Paper Guide 1 2 2 Mount Upstream Sheet Guides or D...

Страница 8: ...ermination plugs as shown 3 Install Cable Protection A 4 Fasten screws M6SF TT M5x10 B 2X Male Plug Female Plug B A Screws to use 1 2 4 Disconnect Power Install Termination Plugs and Cable Protection...

Страница 9: ...all four corners of the machine NOTE the distance D might be different depending on system con figuration e g whether the upstream device has a decurler or not and on floor characteristics 5 Place a s...

Страница 10: ...am Grounding Plate 6 Place the spirit level on the infeed middle cover and on the exit middle cover of the HCI to check that the machine is leveled 7 Place one foot under the left screw E behind the d...

Страница 11: ...mechanism B 4 Align the docking mechanisms on the Upstream Device and the HCI3500 5 Push the machines together 6 Push the locking mechanism back in 7 Re install locking screw A B 1 2 8 Dock to Upstrea...

Страница 12: ...ector A to the printer 2 Connect the downstream device connector B to the HCI3500 1 2 11 Connect Electrical Connectors A B 1 2 10 Dock Downstream Device 1 2 9 Install Paper Supports 1 Open up upper tr...

Страница 13: ...lifting the cover up and then out using the handles B 3 Turn off Service Power Switch C 4 Replace Rear Cover 5 Retry Section 1 2 12 Steps 3 through 6 1 2 HCI3500 Installation Continued C B A 1 2 13 Tu...

Страница 14: ...stem service manual 6 If a new software is installed recalibrate the DSD sensors according to the procedure described in the System Operator Manual 7 Turn off the main power switch 1 Turn on the upstr...

Страница 15: ......

Страница 16: ......

Отзывы: