3
Carefully remove all pieces from carton and
make sure that you have all parts listed (refer
to parts list on page 2).
If you are missing parts, please call GHP
customer service at 1-877-447-4768.
1. Insert 3 dowels (CC) into predrilled holes in
edge of left pilaster (E). Slip left side panel (C)
over dowels in left pilaster (E) and attach with
bolts (AA) and washers (BB) through predrilled
holes as illustrated. Tighten with screwdriver.
Repeat using right pilaster (F) and right side
panel (D).
2. Insert 4 dowels (CC) into pre-drilled holes in
front panel (G). Slip left side panel assembly
over dowels (CC) on the left side of front panel
(G). Slip right side panel assembly over dowels
(CC) on the right side of front panel (G). Make
sure both panels are snug, then secure with
washers (BB) and bolts (AA) inserted through
pre-drilled holes as illustrated. Tighten with
screwdriver.
3. Set base (B) on a flat, smooth surface. Insert
6 dowels into predrilled holes in base (B). Slip
assembly over dowels (CC) and secure with
bolts (AA) and washers (BB) inserted through
pre-drilled holes as illustrated. Tighten with
screwdriver.
ASSEMBLY INSTRUCTIONS
CC
D
BB
AA
1
E
F
C
2
BB
AA
CC
G
BB
A
CC
B
3