4
4. Set base (B) upright and insert 4 dowels
(CC) into pre-drilled holes in base (B). Slip
assembly over dowels in base (B). Make sure
assembly is snug, then secure with washers
(BB) and bolts (AA) inserted through pre-drilled
holes as illustrated. Tighten with screwdriver.
5. Insert 4 dowels (CC) into pre-drilled holes in
top edge of left and right pilasters (F&G). Slip
front panel (H) over dowels until snug, then
secure with washers (BB) and bolts (AA)
inserted through pre-drilled holes as illustrated.
Tighten with screwdriver.
6. Set top panel (A) on top of assembly. Secure
from the inside with bolts (AA) and washers
(BB) through predrilled holes as illustrated.
Tighten with screwdriver.
ASSEMBLY INSTRUCTIONS
4
5
6
B
BB
AA
H
BB
AA
BB
AA
A
CC
CC