background image

Guidelines & Information (fs RS_stand)

 Annex Page 1 

Guidelines

Rocking/Springing Equipment 
Intended for Standing Use Zones

A

 =  

ASTM: 84 in. (2134 mm)

 

CSA: 2100 mm

 

EN: 1500 mm

Important ! Please Read Completely Before Beginning Installation. 

According 

to a report published by the U. S. Consumer Product Safety Commission (C.P.S.C.) 
72% of all playground injuries result from accidental falls.  With this in mind, this 
equipment is designed to fi ll the need for safe yet challenging play. In conjunction 
with design efforts to reduce the possibilities of injuries, this equipment 

must

 be 

installed "Step by Step" per our installation instructions.  As a new owner you 
are responsible for the correct installation, safe use, and maintenance of your 
equipment.

Installation Guidelines
• 

Identify all  parts and thoroughly read the assembly instructions  before 

beginning construction.

• 

Refer to your playground equipment plan and footing diagram to assure 

the equipment purchased

 

will fi t into your selected site area.  The use and no-

encroachment zones around the play equipment shall be obstacle-free areas 
designated for unrestricted circulation.

• ASTM 

compliance: 

For rocking/springing equipment intended for standing, 

the use zone should extend on all sides a minimum distance of 84 inches (2134 
mm). This use zone may not be overlapped by the use zones of adjacent play 
equipment. See diagram.

• CSA 

compliance: 

For rocking/springing equipment intended for standing, 

the use zone should extend on all sides a minimum distance of 2100 mm. This 
use zone may not be overlapped by the use zones of adjacent play equipment. 
See diagram.

• 

EN Compliance: 

For rocking/springing equipment intended for standing, the 

use zone should extend on all sides a minimum distance of 1500 mm.

• 

Site layout is a critical part of the overall installation.  Footings must be 

measured and marked accurately according to the footing diagram.  A level and 
clear installation site is ideal.

• 

Good drainage around the structure and its supports is important.  Inquire 

with local contractors for appropriate recommendations.

• 

After laying out all footings and before digging holes, be sure to inquire about 

underground utilities that may exist.

• 

Do not leave the job site unattended without making sure that all fastening 

hardware on all components are tightened according to tightening torque 
specifi cations listed on every installation guide.  We also recommend roping off 
construction area and covering all holes that do not contain a piece of equipment 
with plywood or other suitable material.

• 

Excavate holes as shown in the footing detail.  If a level and clear site cannot 

be obtained, adjust the depth of footing to maintain a level footing base. If soil 
conditions are loose or unstable, a larger diameter footing may be required.  Inquire 
with local contractors for appropriate recommendations. Be sure concrete that 
might have splashed onto the unit is washed off before it dries.  Allow concrete to 
harden 72 hours before allowing your structure to be used. 

Assemble the entire 

structure before pouring concrete unless specifi cally instructed to do so in 
the installation instructions.

• 

Insure that Age Appropriate and Hard Surface Warning/Playworld Systems 

identifi cation labels are properly affi xed to the play equipment. Labels are to be 
plainly visible according to current playground equipment guidelines.

A

A

A

Placement of multiple rocking springing 

equipment intended for standing

Содержание XX0598

Страница 1: ... 155 5 Kilos Concrete Required 0 24 cubic yard 0 18 cubic meter Use Zone Refer to Use Zone information User Group ages ASTM CSA 2 12 yrs EN 2 14 yrs Assembly View A Use Zones Quattro See Saw A ASTM 84 in 2134 mm CSA 2100 mm EN 1500 mm Weights are approximate for determining manpower ICON KEY Fully Tighten Hardware Add 1 Drop of Thread Locking Adhesive Do Not Fully Tighten Hardware Pour Concrete Dr...

Страница 2: ...ker with line or factory applied mark designating protective surfacing level on a clear and level installation site If play structure is installed on uneven terrain maintain support post mark at protective surfacing level at lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level Do not encase bottom of support post in concre...

Страница 3: ...218 Page 3 of 14 Installation Instructions Footing Diagram Elevation View Top View Surfacing Warning Label Apply The Surface Warning Labels Here 17 8 452 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters ...

Страница 4: ...x Nut w Locking Ring BAE0621 3 8 Flat Washer BAE0595 1 25 O D Flat Washer BAE0690 1 2 Hex Lock Nut BAE0720 Spring Wedge AAU0062 Spring ATM0014 3 8 x 2 U bolt BAE0028 1 2 x 2 94 U Bolt BAE1574 Base Frame AFR1087 3 8 Hex Nut w Locking Ring BAE0621 3 8 Flat Washer BAE0595 Note Arrange spring as shown in Detail A 2 Ensure that the 1 1 2 U bolt is lined up with the outer two holes on the side of the mo...

Страница 5: ...Model XX0598 ECN2218 Page 5 of 14 Installation Instructions Detail D Step 7 Pivot Assembly ASY0256 3 8 x 3 4 Button Head Bolt BAE0659 3 8 Flat Washer BAE0595 Base Frame AFR1087 ...

Страница 6: ...062 Spring ATM0014 Detail E 2 Step 8 See Saw Frame AFR1438 Detail E 3 Step 8 1 2 x 2 94 U Bolt BAE1574 See Notes over at the right Note Arrange spring as shown in Detail D 3 Ensure that the 2 94 U bolt is lined up with the outer two holes on the side of the mounting plate Bottom View of the frame Important Note The 2 94 U bolt attaches through the spring wedge then the 2 U bolt over the second and...

Страница 7: ...on Head Bolt BAE0666 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 3 8 Flat Washer BAE0595 Plastic Trim BFC1017 Left BFC1018 Right See Saw Frame 3 8 Flat Washer BAE0595 1 Bolts only Detail G 1 Step 10 Detail G 2 Step 10 See Saw Frame AFR1438 Cover Panel BFC0489 Cover Panel BFC0489 See Saw Frame AFR1438 3 8 x 1 1 4 Button Head Bolt BAE0666 3 8 I D x 1 1 4 O D Fender Washer BAE0936 ...

Страница 8: ... Installation Instructions Detail I Step 12 3 8 x 1 1 4 Button Head Bolt BAE0666 See Saw Frame Handle Side Panel BFC0488 Detail J Step 13 3 8 x 1 1 2 Button Head Bolt BAE06645 3 8 Flat Washer BAE0595 Handle AAU0086 3 8 Lock Nut BAE0620 ...

Страница 9: ...on Head Bolt BAE0664 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 Seat Cover BFC0487 3 8 Flat Washer BAE0595 3 8 Flat Washer BAE0595 3 8 Lock Nut BAE0620 Detail L Step 15 Seat Mounting Bracket 3 8 x 1 Button Head Bolt BAE0664 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 Seat Cover BFC0487 3 8 Flat Washer BAE0595 ...

Страница 10: ... it is plumb and level after pouring the concrete Attach the pivot assembly to the base frame __Step 7 Attach the pivot assembly to the base frame See Detail D Select the pivot assembly and the appropriate hardware There are 12 twelve connections Position the pivot assembly down over the sides of the frame align the holes apply a drop of thread locking adhesive to the bolt threads and attach as sh...

Страница 11: ...p 13 Attach the handles to the side panels See Detail J Select 8 eight handles and the appropriate hardware There are 32 thirty two connections Position each handle between the top or bottom of each pair of side panels and make attachments as shown Attach the seat covers to the seat mounting bracket __Step 14 Attach the seat covers to the seat mounting bracket See Detail K Select 4 four seat cover...

Страница 12: ...BOLT 3 8 16 x 3 4 BUTTON HEAD SS 12 BAE0664 BOLT 3 8 16 x 1 BUTTON HEAD SS 32 BAE06645 BOLT 3 8 16 x 1 1 2 BUTTON HEAD SS 32 BAE0666 BOLT 3 8 16 x 1 1 4 BUTTON HEAD SS 76 BAE06673 BOLT 3 8 16 x 2 BUTTON HEAD SS 2 BAE06681 BOLT 3 8 16 x 3 BUTTON HEAD SS 12 BAE0690 WASHER 531 I D x 1 250 O D x 060 THICK 8 BAE0720 NUT 1 2 13 LOCK 8 BAE0910 TOOL 1 4 SHORT HEX KEY WRENCH 1 BAE0922 TOOL TT 45 L WRENCH 2...

Страница 13: ...d lock loctite to the bolt before reinstallation Welds Inspect all welded joints If any broken welds are detected barricade equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Equipment Maintenance Playworld Systems Model XX0598 Quattro See Saw w Seat Backs Castings Visually inspect handles and end caps for cracks or breakage If a...

Страница 14: ...se Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corrective Action Date Inspector Name Please Print __________________________________ Signature _________________________________________ Date ___ ___ ___ Inspection Codes P Pass F Fail NA Not Applicable INSPECTION CHECKLIST Fr...

Страница 15: ...e For rocking springing equipment intended for standing the use zone should extend on all sides a minimum distance of 1500 mm Site layout is a critical part of the overall installation Footings must be measured and marked accurately according to the footing diagram A level and clear installation site is ideal Good drainage around the structure and its supports is important Inquire with local contr...

Страница 16: ...el alignment tool 3 8 ratchet with 9 16 socket and 9 16 combination wrench Maintenance Inadequate maintenance of equipment has resulted in injuries on the playground Because the safety of playground equipment and its stability depends on good inspection and maintenance a comprehensive maintenance program must be developed for each playground and strictly followed All equipment must be inspected fr...

Страница 17: ...ight dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque specifications listed on your installation instructions Insure all exposed pipe ends have properly installed end caps Insure that drive rivets are secure Clean dried concrete off of components and any other affected surface Touch up any s...

Отзывы: