Playworld Systems XX0355 Cruise Line Скачать руководство пользователя страница 5

Installation Instructions

Model XX0355

ECN2579

Page 5 of 16

FOOTING NOTES

•  Support post footing depth equals 52 in. (1321 mm) less the depth of the protective 

surfacing material. The post is designed to have 34" (864 mm) in concrete.

•  Some support posts and component support legs may have either a factory-applied 

sticker with line, or factory-applied mark designating protective surfacing level on a clear 
and level installation site. 

•  If play structure is installed on uneven terrain, maintain support post mark at protective 

surfacing level at lowest grade. Adjust other footings accordingly. Support posts and all 
attaching decks and play components must be plumb and level.

•  Do not encase bottom of support post in concrete. Place post directly on packed stone 

or porous block.

•  The footings shown on Playworld Systems’ documentation are recommendations based 

on historical performance in average soil conditions. Footing dimensions may be modifi ed 
by the owner based on actual soil conditions. 

  For example:
  - If local soil is loose or unstable, a larger footing may be required. 
  - If local soil is considered stable, such as bedrock, clay or hard packed earth, a smaller 

footing may be used. Before changing footing dimensions, we strongly recommend that 
the footings be reviewed and approved by a registered engineer.

•  Base of footing must be below frost line.

•  Assemble the entire structure before pouring concrete unless specifi cally instructed to 

do so in the individual component installation instructions.

Support Post Footing Detail

Ground 
Level

Concrete

Protective 
Surfacing 
Level

2b Stone

34"

(864 mm))

52"

(1321 mm)

34"

(864 mm)

Square

Содержание XX0355 Cruise Line

Страница 1: ...8 man hours Concrete Required 6 65 cubic yards 5 06 cubic meters Use Zone Refer to the information below User Group Age years ASTM CSA 5 12 EN 6 14 Assembly View Equipment Use Zone A ASTM 72 in 1830 m...

Страница 2: ...Installation Instructions Model XX0355 ECN2579 Page 2 of 16 Top View Elevation Views 27 686 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters...

Страница 3: ...ons Model XX0355 ECN2579 Page 3 of 16 Footing Diagram 1 Top View Important Note Make sure the footings are laid out and spaced as shown in this Footing Diagram KEY Position Unit of Measurement Top Inc...

Страница 4: ...Installation Instructions Model XX0355 ECN2579 Page 4 of 16 Footing Diagram 2 Side View and Top View KEY Position Unit of Measurement Top Inches Bottom Millimeters...

Страница 5: ...in concrete Place post directly on packed stone or porous block The footings shown on Playworld Systems documentation are recommendations based on historical performance in average soil conditions Foo...

Страница 6: ...t frames Support Frame AFR1474 4 Total 12 x 2 Self Threading Screw BAE0015 8 Total Post Cap BPL0313 4 Total Cruise Line Platform BPL3175 1 Total Cruise Line Bumper AAU0790 2 Total 3 8 Flat Washer BAE0...

Страница 7: ...ball halves from one end of each rope and insert the rope through a platform casting Cruise Line Rope AMC0662 4 Total Right Casting AAU0791 2 Total Left Casting AAU0792 2 Total Place one frox ball hal...

Страница 8: ...out Side with the riv nuts must be to the inside 2 25 Spacer ATM0250 8 Total Detail D 1 Attach the spacer plates to the trolley brackets Detail D 2 Attach the 2 25 spacers to the trolley brackets 3 8...

Страница 9: ...9 Attach the pulley to the trolley bracket assembly Cable Assembly ASY0330 2 Total Trolley Bracket Assembly Pulley Assembly ASY0357 2 Total 375 Spacer ATM0249 4 Total 1 2 Flat Washer BAE0690 4 Total...

Страница 10: ...ts Detail F 2 Seat the ropes in the first housing and attach the second housing to the trolley brackets Cable Guide AMC0660 4 Total Thin edge to the top Bend the cable guide to match the contour of th...

Страница 11: ...Head Bolt BAE0671 8 Total Cable Assembly Note Use of a 7 ft or 8 ft step ladder will be needed to perform this step Important Note when attaching the cable assemblies to the support posts make sure th...

Страница 12: ...355 ECN2579 Page 12 of 16 Detail H Step 13 Attach the platform to the ropes Cruise Line Platform 3 8 Flat Washer BAE0595 8 Total Contour of the casting must match the contour of the platform 3 8 x 1 1...

Страница 13: ...nstallation attach the trolleys to the cable wire on the ground Step 9 Attach the pulley to the trolley bracket assembly See Detail E Place a cable into the open end of each bracket assembly and then...

Страница 14: ...NUT 1 4 20 HEX LOCK w o NYLON CAP 8 BAE0595 WASHER 3 8 SAE FLAT 20 BAE0600 WASHER 1 O D FLAT 24 BAE0621 NUT 3 8 16 ZINC HEX w LOCKING RING 4 BAE0632 NUT 3 8 16 x 1 25 BARREL w PATCH 8 BAE0664 BOLT 3 8...

Страница 15: ...cks or breakage If any damage is detected barricade the equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Welds Inspect all welded...

Страница 16: ...Sake Repairer Name Please Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corr...

Страница 17: ...dependent upon the types of included play equipment Refer to the Use Zone diagram or master structure drawing Site layout is a critical part of the overall installation Footings must be measured and m...

Страница 18: ...ehensive maintenance program must be developed for each playground and strictly followed All equipment must be inspected frequently for any potential hazards Special attention must to be given to movi...

Страница 19: ...height dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque speci cations listed on your instal...

Отзывы: