Playworld Systems XX0355 Cruise Line Скачать руководство пользователя страница 13

Installation Instructions

Model XX0355

ECN2579

Page 13 of 16

Notes Before You Begin:

 Do not over tighten bolts during assembly, only snug 

tighten them until assembly is complete.  

Carefully read and understand these installation instructions before you 
begin.
Step  1:

  Before  attempting  to  assemble  your  equipment,  please  review  all 

installation information carefully. Should you experience any diffi culty during the 
installation process, please call us at the phone number shown on the last page 
of these instructions.

Step 2:

 Separate and identify all components and hardware. 

Step 3:

 Excavate the footings as shown in the 

Support Post Footing Detail

 on 

the page 5 of this document. Make sure the footings are laid out and spaced as 
shown in this 

Footing Diagram

.

Step 4:

 Attach the post caps to the support frames. See 

Detail A

. Place each 

cap on top of a support frame so they point inward when the frames are placed in 
their footings. Ensure the caps are fully seated on the frames. Use the supplied 
3/16" drill bit to drill through the cap and support frame using the indents in the 
cap as a guide. Thread each screw through the cap and into the support frame. 
Fully tighten all fasteners according to tightening torque specifi cations. 

Torque Specifi cations: 

 

Bolts and nuts

 - Snug tighten and then tighten an additional one half turn.

Step 5:

 Place the footing frames in their footings. Block and brace for concrete. 

Pour concrete and allow 72 hours for concrete to completely cure

.

Step 6:

 Attach the bumpers to the platform. See 

Detail B

. Position a bumper 

against  each end of the platform, apply a drop of thread locking adhesive to 
the bolt threads, and attach as shown. Fully tighten all fasteners according to 
tightening torque specifi cations.

Step 7:

 Place one end of each rope through a left or right platform casting. See 

Detail C

. Remove the frox ball halves from one end of each rope and insert the 

rope through a platform casting. Place one frox ball half over the ferrule on the 
end of the rope. Slide the other frox ball half onto the fi rst. Balls are grooved and 
will slide together.

Step  8:

 Attach  the  spacers  to  the  trolley  brackets.  See 

Details  D-1  and  D-2

Sandwich the spacer plates between the trolly brackets and attach as shown. 
Insert the 2.25 in. spacers between the brackets and attach as shown.

Note: For ease of installation, attach the trolleys to the cable wire on the 
ground.
Step 9:

 Attach the pulley to the trolley bracket assembly. See 

Detail E

. Place a 

cable into the open end of each bracket assembly and then insert the spacers 
and a pulley. Spacers will seat in the middle of the pulley. Align the holes and 
attach as shown.

Step 10:

 Fully tighten the trolley mounting bracket connections before attaching 

the pulley housings beginning in the next step.

Step 11:

 Attach the trolley housings to the trolley brackets. See 

Detail F-1 and 

F-2

. Place a cable guide on the cable on each side of the trolley brackets making 

sure the smooth end of the guide is to the top. Place the housing against one side 
of the bracket assembly, bend the cable guide to the contour of the housing and 
seat in the designated slot of the housing. Apply a drop of thread locking adhesive 
to the bolt threads and attach the housing to the bracket assembly as shown. Seat 
the open ends of the cruise line ropes in the trolley housing. Each housing should 
have one rope with a right casting and one rope with a left casting. Position the 
remaining trolley housing to the other side of each trolley bracket assembly, apply 
a drop of thread locking adhesive to the bolt threads, and attach as shown. Fully 
tighten all fasteners according to tightening torque specifi cations.

Step 12:

 Attach the cable assemblies to the support frames. See 

Detail G

. Position 

the cable assemblies between the support posts making sure the ropes with the 
same casting are be diagonally across from each other when the cable assemblies 
are hung between the posts (see the reference next to the detail).  Position the 
casting on the end of each cable over the holes in the top of the support frames 
and attach as shown. 

Ensure the castings on the cable are oriented with the 

numbers at the top before making the connection! 

Fully tighten all fasteners 

according to tightening torque specifi cations.

Note: 

Use of a 7 ft. or 8 ft. step ladder will be needed to perform this step.

Step 13:

 Attach the platform to the ropes. See 

Detail H

. Lift the platform up to 

accept the castings on the end of the ropes, apply a drop of thread locking adhesive 
to the bolt threads, and attach as shown. Ensure that the contour of the casting 
matches the contour of the indentation in the platform. Fully tighten all fasteners 
according to tightening torque specifi cations.

Step 14:

 For areas complying with ASTM standard F1487 or the CSA Z-614, 

apply the age appropriate label to the side panel at eye level.

Содержание XX0355 Cruise Line

Страница 1: ...8 man hours Concrete Required 6 65 cubic yards 5 06 cubic meters Use Zone Refer to the information below User Group Age years ASTM CSA 5 12 EN 6 14 Assembly View Equipment Use Zone A ASTM 72 in 1830 m...

Страница 2: ...Installation Instructions Model XX0355 ECN2579 Page 2 of 16 Top View Elevation Views 27 686 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters...

Страница 3: ...ons Model XX0355 ECN2579 Page 3 of 16 Footing Diagram 1 Top View Important Note Make sure the footings are laid out and spaced as shown in this Footing Diagram KEY Position Unit of Measurement Top Inc...

Страница 4: ...Installation Instructions Model XX0355 ECN2579 Page 4 of 16 Footing Diagram 2 Side View and Top View KEY Position Unit of Measurement Top Inches Bottom Millimeters...

Страница 5: ...in concrete Place post directly on packed stone or porous block The footings shown on Playworld Systems documentation are recommendations based on historical performance in average soil conditions Foo...

Страница 6: ...t frames Support Frame AFR1474 4 Total 12 x 2 Self Threading Screw BAE0015 8 Total Post Cap BPL0313 4 Total Cruise Line Platform BPL3175 1 Total Cruise Line Bumper AAU0790 2 Total 3 8 Flat Washer BAE0...

Страница 7: ...ball halves from one end of each rope and insert the rope through a platform casting Cruise Line Rope AMC0662 4 Total Right Casting AAU0791 2 Total Left Casting AAU0792 2 Total Place one frox ball hal...

Страница 8: ...out Side with the riv nuts must be to the inside 2 25 Spacer ATM0250 8 Total Detail D 1 Attach the spacer plates to the trolley brackets Detail D 2 Attach the 2 25 spacers to the trolley brackets 3 8...

Страница 9: ...9 Attach the pulley to the trolley bracket assembly Cable Assembly ASY0330 2 Total Trolley Bracket Assembly Pulley Assembly ASY0357 2 Total 375 Spacer ATM0249 4 Total 1 2 Flat Washer BAE0690 4 Total...

Страница 10: ...ts Detail F 2 Seat the ropes in the first housing and attach the second housing to the trolley brackets Cable Guide AMC0660 4 Total Thin edge to the top Bend the cable guide to match the contour of th...

Страница 11: ...Head Bolt BAE0671 8 Total Cable Assembly Note Use of a 7 ft or 8 ft step ladder will be needed to perform this step Important Note when attaching the cable assemblies to the support posts make sure th...

Страница 12: ...355 ECN2579 Page 12 of 16 Detail H Step 13 Attach the platform to the ropes Cruise Line Platform 3 8 Flat Washer BAE0595 8 Total Contour of the casting must match the contour of the platform 3 8 x 1 1...

Страница 13: ...nstallation attach the trolleys to the cable wire on the ground Step 9 Attach the pulley to the trolley bracket assembly See Detail E Place a cable into the open end of each bracket assembly and then...

Страница 14: ...NUT 1 4 20 HEX LOCK w o NYLON CAP 8 BAE0595 WASHER 3 8 SAE FLAT 20 BAE0600 WASHER 1 O D FLAT 24 BAE0621 NUT 3 8 16 ZINC HEX w LOCKING RING 4 BAE0632 NUT 3 8 16 x 1 25 BARREL w PATCH 8 BAE0664 BOLT 3 8...

Страница 15: ...cks or breakage If any damage is detected barricade the equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Welds Inspect all welded...

Страница 16: ...Sake Repairer Name Please Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corr...

Страница 17: ...dependent upon the types of included play equipment Refer to the Use Zone diagram or master structure drawing Site layout is a critical part of the overall installation Footings must be measured and m...

Страница 18: ...ehensive maintenance program must be developed for each playground and strictly followed All equipment must be inspected frequently for any potential hazards Special attention must to be given to movi...

Страница 19: ...height dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque speci cations listed on your instal...

Отзывы: