16. Fasten Monkey Rings to
chains using quick link
connectors. Tighten securely
with an adjustable wrench.
(Fig. 7)
10. Install one top header (
2" x 6" x your tower
width)
flush with top and outside of 4" x 4"
posts. The top header must be 8' as shown.
Secure with eight #8 x 2
¹|₂
" deck screws
and two
³|₈
" x 3" lag screws with washers.
(Fig. 5)
11. Position monkey ring support
approximately eight feet from tower
opening. Install beam assembly in
the center of tower opening and
monkey ring support. Attach with
one #8 x 2
¹|₂
" deck screw and secure with
four
³|₈
" x 3" lag screws and washers each
end.
(Fig. 5)
12. Install two 2" x 4" x 18" ground stakes between
base boards and 4" x 4" posts as shown. Install
two 2" x 4" x 18" ground stakes at a 30° angle on
inside of base boards approximately 3
¹|₂
" from end (outside
dimensions of wall support must be 21
¹|₂
"). Secure with four
#8 x 2
¹|₂
" deck screws each.
(Fig. 5)
Fig. 7
Detail
Fig. 6
13. Install ten 5/4" x 6" x 28
¹|₂
" wall decking. Hold
wall supports at 21
¹|₂
" apart (measured outside
to outside).
(Fig. 6)
14. Place first board tight against bottom of top
step with equal overhang on both sides,
approximately 3
¹|₂
". Secure with four
#8 x 2
¹|₂
" deck screws.
(Fig. 6)
15. Install next board tight against first, keeping
21
¹|₂
" measurement and secure with #8 x 2
¹|₂
"
deck screws. Repeat for remaining boards.
(Fig. 6)
Fig. 5
Detail of Screw Placement
Predrill –
1
/
8
" Dia. for #8 x 2
1
/
2
" deck screws
21
1
/
2
"
Page 4
E
E
21
1
/
2
"
E
E
E
E
E
E
E
E
E
5/
4"
x6
"x
28
1
/
2
"
Predrill –
1
/
8
" Dia. for #8 x 2
1
/
2
" deck screws
1
/
4
" Dia. for
3
/
8
" x 3" lag screws
B
Detail of Screw
Placement
A PlayStar Tower shown.
Your Tower may be different.
8'
B
B
17. When installing the optional
Climbing Rope (PS 7828) or
Climbing Rocks (PS 7830),
follow the instructions
included with the item.
COMPONENTS
Mounting
Instructions
Note: Using a scrap of wood between the end of the stake and the
hammer will reduce the likelihood of the end of the stake splitting.
Note: If soil conditions permit stakes to be pulled
out easily, such as in sandy soil conditions,
cementing is required. If your ground is too hard to
pound in the stakes, you can remove the earth with a
shovel. Install the stakes and compact the earth as you replace it.
Stakes must be placed below the level of the shock-absorbing
surfacing material to prevent tripping or injury resulting from a fall.