Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
STEP DECK ASSEMBLY
Rev E
6/22/2009
1202
Page 3 of 3
Parts List
Specifications
Step 2
Attach the Step Deck 2 to the Step Deck Leg as
shown in Figure 2. (See Note A)
Step 3
If required attach Vertical Deck Filler. (See Note C)
Step 4
Fully tighten all fasteners according to the
"TIGHTENING TORQUE FOR HARDWARE"
section of the Installation Manual.
Step 5
Place in footing hole. Plumb and level entire
component. Pour concrete into footing hole. Allow
at least 72 hours to cure before using this
equipment. (See Note B)
Step 6
Place appropriate compliant protective surfacing
under and around Step Deck Assembly.
(See Note D)
Part #
DESCRIPTION
QTY.
CE-4150
Step Deck 2
1
FS-1202
Step Deck Leg
2
9103062-TR
Bolt Button Head 3/8" x 1-1/4"
4
9333002
Washer Flat 3/8" x 1" O.D. x .100" thick
8
9413002
Nut Lock 3/8"
4
STEP DECK 2:
Shall be fabricated using punched and formed 12
gauge sheet steel. The Step Deck #2 shall be
Play-Tuff ™coated after fabrication.
STEP DECK LEGS:
Shall be fabricated from 1.660" O.D. 11 gauge
steel tubing welded to a 10 gauge mounting
bracket. Step Deck Leg shall have a multi-stage
baked-on powder coat finish.
HARDWARE:
Shall be stainless steel, zinc/nickel plated or
galvanized as required to resist rust and corrosion.
Periodically tighten all screws, bolts and nuts. A
periodic inspection of all parts is necessary. If a part
is broken or worn, replace immediately. For general
maintenance please refer to our Playground
Maintenance Manual.
Maintenance
3/8" x 1-1/4"
Button Head Bolt
3/8" x 1" O.D.
Washer
STEP
DECK 2
STEP DECK
LEG
3/8" x 1" O.D.
Washer
3/8" Lock
Nut
Figure 2