background image

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

STEP DECK ASSEMBLY

Rev E

6/22/2009

1202

Page 3 of 3

Parts List

Specifications

Step 2

 
Attach the Step Deck 2 to the Step Deck Leg as 
shown in Figure 2. (See Note A)

Step 3

 
If required attach Vertical Deck Filler. (See Note C)

Step 4

 
Fully tighten all fasteners according to the 
"TIGHTENING TORQUE FOR HARDWARE" 
section of the Installation Manual.

Step 5

 
Place in footing hole. Plumb and level entire 
component. Pour concrete into footing hole. Allow 
at least 72 hours to cure before using this 
equipment.  (See Note B)

Step 6

 
Place appropriate compliant protective surfacing 
under and around Step Deck Assembly. 
(See Note D)

Part #

DESCRIPTION

QTY.

CE-4150

Step Deck 2

1

FS-1202

Step Deck Leg

2

9103062-TR

Bolt Button Head 3/8" x 1-1/4"

4

9333002

Washer Flat 3/8" x 1" O.D. x .100" thick

8

9413002

Nut Lock 3/8"

4

STEP DECK 2:
Shall be fabricated using punched and formed 12 
gauge sheet steel. The Step Deck #2 shall be 
Play-Tuff ™coated after fabrication.

STEP DECK LEGS:
Shall be fabricated from 1.660" O.D. 11 gauge 
steel tubing welded to a 10 gauge mounting 
bracket. Step Deck Leg shall have a multi-stage 
baked-on powder coat finish.

HARDWARE:
Shall be stainless steel, zinc/nickel plated or 
galvanized as required to resist rust and corrosion.

Periodically tighten all screws, bolts and nuts. A 
periodic inspection of all parts is necessary. If a part 
is broken or worn, replace immediately. For general 
maintenance please refer to our Playground 
Maintenance Manual.

Maintenance

3/8" x 1-1/4" 

Button Head Bolt

3/8" x 1" O.D. 

Washer

STEP 

DECK 2

STEP DECK 

LEG

3/8" x 1" O.D. 

Washer

3/8" Lock 

Nut

Figure 2

Отзывы: