GENErAL NOTES
INSTALLATION INSTrucTIONS
• Due to variables in local soil
conditions, footing sizes may vary to
meet local codes.
• Actual on-site conditions may vary
and may require modifications to
installation method.
• Use care and caution while handling
play pieces. Make sure all points
of contact are protected from lifting
straps or other machinery that may
damage the piece.
• Bracing materials may be required
during installation.
Tools required:
• Shovel /Auger
• Nylon lifting strap, minimum 8’ length
Note: Rated for 500 lbs. minimum
• Concrete
Note: Rated for 2,500 psi minimum
Weight:
90-125 lbs. per Tree Slice Stepper
Step 1:
Thoroughly inspect all pieces before unloading for damages incurred
during shipping.
Step 2:
Establish layout of Tree Slice Stepper and dig footing holes.
Step 3:
Place 10” diameter Sonotube into footing hole. Sonotube height should
be 10” above grade for 12” of play surfacing. Fill Sonotube with concrete.
Step 4:
While concrete is still wet, thread J-bolts (2 per Tree Slice Stepper) into inserts,
then carefully place Tree Slice Stepper into Sonotube. Make sure piece is
centered and level.
Step 5:
Once concrete has hardened, remove all remaining packaging materials
and inspect piece for blemishes. Use included touch-up kit as needed.
Содержание ultraPLAY NatureROCKS 5TSL
Страница 1: ...ELEVATION PLAN Tree Slice Steppers 5TSL ...