background image

GENErAL NOTES

INSTALLATION INSTrucTIONS

•  Due to variables in local soil

conditions, footing sizes may vary to
meet local codes.

•  Actual on-site conditions may vary

and may require modifications to
installation method.

•  Use care and caution while handling

play pieces. Make sure all points
of contact are protected from lifting
straps or other machinery that may
damage the piece.

•  Bracing materials may be required

during installation.

Tools required:

• Shovel /Auger

•  Nylon lifting strap, minimum 8’ length

Note: Rated for 500 lbs. minimum

•  Concrete

Note: Rated for 2,500 psi minimum

Weight:  

90-125 lbs. per Tree Slice Stepper 

Step 1: 

  Thoroughly inspect all pieces before unloading for damages incurred 

during shipping.

Step 2: 

  Establish layout of Tree Slice Stepper and dig footing holes.

Step 3:  

 Place 10” diameter Sonotube into footing hole. Sonotube height should 
be 10” above grade for 12” of play surfacing. Fill Sonotube with concrete.

Step 4: 

  While concrete is still wet, thread J-bolts (2 per Tree Slice Stepper) into inserts, 

then carefully place Tree Slice Stepper into Sonotube. Make sure piece is 
centered and level.

Step 5:   

Once concrete has hardened, remove all remaining packaging materials 
and inspect piece for blemishes. Use included touch-up kit as needed.

Отзывы: