Installation
In-Ground Mount : New Concrete
Arc
Rack
TOOLS NEEDED
Level
Cement mixing tub
Shovel
Pour concrete and allow to cure.
An easy way to brace the Arc Rack while the grout sets is to bolt
two 1x4” boards together at one end and clamp them onto the
legs of the Arc Rack like a clothes pin.
Place corrosion resistant sleeve (min. 4” inside diameter) in sand
pour bed in exact location where rack will be installed. Make
sure top of sleeve is at same level as desired finished concrete
surface. Fill sleeve with sand to keep it in place and prevent it
from filling with concrete.
After appropriate cure time, dig out sand from sleeves and insert
racks, making sure they are level and at the appropriate height.
Pour in Super Por-Rok or epoxy grout and allow to set.
1
3
2
Trowel
Corrosion-Resistant Sleeve (min. 4” diameter)
Materials to build brace (see “Install Tip” at bottom of page)
Sand pour bed
Sleeves
Final grade level
Poured concrete
(4-7” deep)
TIP