BOLT
3/8" x 3-1/2"
CARRIAGE
SWING BEAM PLATE
STEP 21: SWING BEAM PLATE
1: PLACE THE SWING BEAM PLATE ON TOP OF THE SWING BEAM SUPPORT, LINING UP THE PILOT HOLES.
2: FASTEN THE SWING BEAM PLATE TO THE SWING BEAM SUPPORT USING 3-1/2" CARRIAGE BOLTS ON TOP, AND 3/8"
LOCK NUTS WITH 3/8" WASHERS FROM UNDERNEATH, IN THE COUNTER-SUNK HOLES OF THE SWING BEAM SUPPORT.
USE BOLT CAPS TO COVER ANY EXPOSED THREADS.
3: LEAVE THE MIDDLE HOLE EMPTY, IT WILL BE USED LATER.
4: IF NECESSARY USE LOCKING PLIERS TO HOLD CARRIAGE BOLTS IN PLACE WHEN INSTALLING.
3/8" WASHER
3/8" NUT
BOLT CAP
55
Содержание 1500EWF
Страница 7: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...PICTURE DESCRIPTION QTY IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0001 ROCK WALL 10 ROPE 6 1 1 28 ...
Страница 39: ...PICTURE DESCRIPTION QTY 90 GREEN BRACKET 11 5013 SPRING CLIP 11 4003 4 6 SAFETY HANDLES PAIR 07 0005 1PR 29 ...
Страница 40: ...PICTURE DESCRIPTION QTY 2 UNASSEMBLED DORMER 1530 BOX 1 UNASSEMBLED CHIMNEY 1530 BOX FLAG KIT 09 1014 2 30 ...
Страница 93: ...APPENDIX 83 ...
Страница 95: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 97: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...