
Step #9
Attach the rail slats to the tower. Fasten each slat with 4
-
1
¾
” washer head screws per
slat. You will need to decide where you want the openings. A standard opening is 20½”
wide. Your tower has enough slats included to enclose everything except two openings.
The standard spacing between slats is 3”.
This is very flexible so you can make changes as needed to get the desired opening.
Pictured on this page and the next is the standard way to do two openings.
There will be a light pencil mark on each slat to help you get the screws straight.
HARDWARE
(
THIS
PAGE
)
56
-
1
¾
”
WASHER
HEAD
SCREWS
3”
3”
3”
3”
3”
3”
7¼”
7¼”
2
-
3/8”
Repeat this on the opposite side of Tower
LONG SIDE OF TOWER
Continued on next page
Содержание Poly Watch Tower
Страница 1: ...Assembly Instructions Poly Watch Tower...
Страница 28: ......