Installation | Assembly Instructions
38
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 6: Preparing the Perforated Pipe
1/4 distance
3/4 distance
25 mm
overhang
25 mm
overhang
13
14
13
8
13
13 8
13
13
1.
and connect
perforated pipe sections (13)
together until the desired length
is achieved (see Note below)
2.
Cut the end of the perforated
pipes (13),
apply glue
, and connect
together using a T-connector (14)
Verify that the holes in the perforated
pipes face the same direction as the
top of the T-connector
3.
Drill 35 mm holes into the
diffuser and gutter in two locations
Verify that the holes are
facing the same direction
NOTE:
The two holes are drilled at
1/4 length and 3/4 length of
the cooling pad system
4.
Place the perforated pipe into the
diffuser, ensuring the T-connectors are fully
inserted into the diffuser and gutter holes
NOTE:
The pipe consists of sections
connected by T-connectors at 1/4
and 3/4 distance of the full cooling
pad length. The pipe overhangs by
25 mm on both sides of the system
WWW