Hydronic Systems
Hydronic Manual
Project Number
N/A
Drawn By
Pivot Hydronics
Checked By
Pivot Hydronics
Date
24/9/16
A- 3.00
Sheet Number
3
REV
-
Pivot Stove and Heating
*NOT TO SCALE*
Notes:
Check valve
Field Pump
Manifolds
Radiator
Solar / Radiator Set Up
1
. Flow to enter in side of tank,
on rise at all times.
2
. Return line to be installed
below tank, on gradient at all
times
3
. Domestic cold water inlet to
feed coil.
4
. Domestic hot water lead to
house.
5
. Overflow vent pipe to be
drained off the roof externally in
copper.
6
. Field pump thermostat to
activate on at 65 degrees.
7
. Field pump to be
8
. Field pump to be installed
above BCU and electricals, are
to be facing upwards.
9 & 10
. Flow and return
manifolds to be installed
horizontally at all times.
11
. Flow and return manifolds
to be installed horizontally at all
times.
12
. Hot Water System flow on
top and return on bottom.
Radiator
Stove Inlet
1
4
5
3
2
Stove outlet
13
10
11
12
13
BCU on
BCU off
Pump
6
7
8
6
7
8
Right Angle Flow
Valve
Right Angle
Return Lock
Shield
Thermostat Wiring
Domestic Water
Outlet
Overflow
Domestic Water
Inlet
Содержание Hydronic
Страница 1: ...Pivot Stove Hydronic Installation Guide...
Страница 3: ......
Страница 4: ......
Страница 9: ......