Hydronic Systems
Hydronic Manual
Project Number
N/A
Drawn By
Pivot Hydronics
Checked By
Pivot Hydronics
Date
24/9/16
A- 6.00
Sheet Number
6
REV
-
Pivot Stove and Heating
*NOT TO SCALE*
Notes:
Check valve
Field Pump
Manifolds
Radiator
In-slab / Radiator Set Up
1
. Flow to enter in side of tank.
2
. Check valve to be installed as
recommended on the flow line
of the BCU or pump tee off. This
will reduce back flow.
3
. Domestic cold water inlet to
lead coil.
4
. Domestic hot water lead to
house.
5 & 6
. Both pumps are to
be activated at the same
temerature.
6
. Field pump thermostat to
activate on at 65 degrees.
7
. Field pump to be ***
8 & 9
. Field pump thermostat to
activate on at 65 degrees.
10
. Radiator flow
11
. Radiator return
12
. In-slab manifold flow
13
. In-slab manifold return
1
2
3
4
5
6
8
9
7
12
13
10
11
BCU on
BCU off
Pump
BCU on
3
4
5 & 6
Right Angle Flow
Valve
Right Angle
Return Lock
Shield
Thermostat Wiring
Header Tank
Feed Point
Содержание Hydronic
Страница 1: ...Pivot Stove Hydronic Installation Guide...
Страница 3: ......
Страница 4: ......
Страница 9: ......