
Pitney Bowes
Direct Mail Solutions
Section 1
3
Pitney Bowes DMS
Installation Instructions Cont’
12. Position the feeder on the inserter table so that the edge of the leading piece
is between the material guide tabs and the bottom of the front hopper plate.
13. Adjust the sensor so that the piece advances out further and is well within the
gripper jaw opening.
14. With the speed control set to minimum, jog the inserter to remove the piece
staged in the gripper jaw and return the gripper jaw to the furthest inward
position.
15. Turn the speed control up slightly. This should advance the next piece into
the gripper jaw. Adjust the sensor, material guide tabs and position the SE
900 EI as needed to align the paper path into the gripper jaw.
16. Load the SE 900 EI with at least a full handful of material and cycle the
inserter.
17. Notice the material path and the presentation to the gripper jaw as this is
most important as the cycle speed is increased.
18. Cycle the inserter at full production speed adjusting the SE 900 EI speed so
that the piece being presented to the gripper jaw is there well ahead of the
end of the forward stroke.
Содержание SE-900-EI
Страница 1: ...SE 900 EI 240 VOLTS Operation Parts Manual ...
Страница 11: ...Pitney Bowes Direct Mail Solutions Section 6 10 Pitney Bowes DMS Parts Manual ...
Страница 13: ...Pitney Bowes Direct Mail Solutions Section 6 12 FIG 6 1 ...
Страница 16: ...Pitney Bowes Direct Mail Solutions Section 6 15 FIG 6 2 ...
Страница 18: ...Pitney Bowes Direct Mail Solutions Section 6 17 FIG 6 3 ...
Страница 20: ...Pitney Bowes Direct Mail Solutions Section 6 19 FIG 6 4 ...
Страница 22: ...Pitney Bowes Direct Mail Solutions Section 6 21 FIG 6 5 ...
Страница 24: ...Pitney Bowes Direct Mail Solutions Section 6 23 FIG 6 6 ...
Страница 26: ...Pitney Bowes Direct Mail Solutions Section 6 25 FIG 6 7 ...
Страница 28: ...Pitney Bowes Direct Mail Solutions Section 6 27 FIG 6 8 ...
Страница 30: ...Pitney Bowes Direct Mail Solutions 29 FIG 6 9 ...
Страница 32: ...Pitney Bowes Direct Mail Solutions 31 FIG 6 10 ...
Страница 34: ...Pitney Bowes Direct Mail Solutions 33 FIG 6 11 ...
Страница 35: ...Pitney Bowes Direct Mail Solutions 34 Section 7 Pitney Bowes DMS SE 900 EI Electrical Schematic ...
Страница 36: ...Pitney Bowes Direct Mail Solutions Section 8 35 900 EI ...