Pitco SSHLV (ROV) Gas Fryers
14. Remove the splash back by lifting up.
15. Remove the six (6) screws, which hold the
tank to the cabinet, using a 5/16 inch socket.
16. Remove the channel strip by pulling up.
17. Score the silicon sealer between the tanks
using a flathead screwdriver or utility knife.
18. Remove high-limit and temperature probes.
See Replacing Ignition Module and Hi-limit
Section 10.
19. Remove the two (2) screws, which hold the
top deck support, using a 5/16 inch socket.
L22-392 Rev 1
66
Содержание SSHLV Series
Страница 13: ...Pitco SSHLV ROV Gas Fryers Figure 2 Auto Filtration Board AFB L22 392 R1 13...
Страница 37: ...Pitco SSHLV ROV Gas Fryers L22 392 R1 37...
Страница 75: ...Pitco SSHLV ROV Gas Fryers 34Information Charts Tables L22 392 Rev 1 75...
Страница 80: ...Pitco SSHLV ROV Gas Fryers 35 2 Wiring Diagram Auto Filter Board AFB2 Wiring ROV L22 392 Rev 1 80...
Страница 82: ...Pitco SSHLV ROV Gas Fryers 35 4 Wiring Diagram Calibration Test Points and Indicators ROV L22 392 Rev 1 82...
Страница 83: ...Pitco SSHLV ROV Gas Fryers 35 5 Wiring Diagram AC DC Control Voltage Supplies ROV L22 392 Rev 1 83...
Страница 84: ...Pitco SSHLV ROV Gas Fryers 35 6 Wiring Diagram Basket Lift Option Connector Locations ROV L22 392 Rev 1 84...
Страница 85: ...Pitco SSHLV ROV Gas Fryers 35 7 Wiring Diagram Filter Pump Options 208V 240V ROV L22 392 Rev 1 85...
Страница 86: ...Pitco SSHLV ROV Gas Fryers 35 8 Wiring Diagram Full Vat with SCB L22 392 Rev 1 86...
Страница 87: ...Pitco SSHLV ROV Gas Fryers 35 9 Wiring Diagram Basket Lifts L22 392 Rev 1 87...
Страница 88: ...Pitco SSHLV ROV Gas Fryers 35 10 Wiring Diagram Filter Motor 115V 60Hz L22 392 Rev 1 88...
Страница 89: ...Pitco SSHLV ROV Gas Fryers 35 11 Wiring Diagrams Filter Motor 208 240V L22 392 Rev 1 89...
Страница 90: ...Pitco SSHLV ROV Gas Fryers NOTES L22 392 Rev 1 90...
Страница 91: ...Pitco SSHLV ROV Gas Fryers NOTES L22 392 Rev 1 91...
Страница 92: ...Pitco SSHLV ROV Gas Fryers L22 392 Rev 1 92...