8
floor
floor
To determine the desired viewing height, use the center slot opening in the wall mount as a center reference for the plasma television when mounted. Once the height is determined,
use the bubble level to insure that the bracket is level. Next, using a pencil, mark the four (4) lag bolt slot openings on the mounting bracket. Before continuing, confirm the marks are
located on the center of the studs.
Drill 1/4" pilot holes on the four (4) markings on the wall. Raise the flat back plate and have someone hold it in place (
arrow side away from the wall and pointing up
).
Put the lag bolt through the flat washers. Screw the lag bolt through the upper left slot opening into the 1/4" pilot hole. Confirm that the wall mount is still leveled and then screw a lag
bolt to the upper right side slot opening into the 1/4" pilot hole. Then install the remaining two lag bolts tightly into the wall studs in the lower left and right slot openings on the wall
mount. Lateral movement of approximately 1½" for final positioning is now possible. Make any positioning changes then secure the lag bolts.
See fig 4.
Wood studs behind
the wall structure
Drill gun with a 1/4"
drill bit
Wall structure
Marking on wall
Flat washers
5/16" Lag bolts
Access holes
PDB-UWFB
(back plate)
Electrical
Step 4
All electrical wiring components should be installed at this time to ensure that the plasma display has enough power sources.
Note:
Pre drill before the securing the
5/16" lag bolts.
Caution:
Do not over tighten the 5/16" lag bolts
Center of
viewing marks