DV-600AV-S
38
1
2
3
4
1
2
3
4
C
D
F
A
B
E
Holder Traverse
Insulator (F)
Traverse Ass'y
Insulator (F)
Insulator (R)
NOTE
1. In case of the Clamper Ass'y installation, install correctly
as Fig. 2-5-B.
Fig. 2-5-B
Plate Clamper
Clamper
2-6: HOLDER TRAVERSE/INSULATOR (F)/INSULATOR
1. Remove the Holder Traverse.
2. Remove the 2 Insulator (F).
3. Remove the Insulator (R).
Fig. 2-6-A
(R) (Refer to Fig. 2-6-A)
NOTE
1. In case of the Insulator (F) installation, install correctly
as Fig. 2-6-B.
Fig. 2-6-B
Traverse Holder
Insulator (F)
2-7: SWITCH PCB ASS'Y/GEAR MIDDLE/GEAR FEED/
RACK FEED ASS'Y/FEED MOTOR
(Refer to Fig. 2-7-A)
1. Unlock the support
1
.
2. Remove the Gear Middle.
3. Remove the screw
2
.
4. Remove the Rack Feed Ass'y.
5. Remove the screw
3
.
6. Remove the Switch PCB Ass'y.
7. Remove the screw
4
.
8. Remove the Gear Feed.
9. Remove the 2 screws
5
.
10. Remove the Feed Motor.
11. Remove the Gear Motor.
3
Gear Middle
Gear Motor
Feed Motor
• Screw Torque: 1.3
±
0.3kgf•cm (Screw
2
)
• Screw Torque: 3.0
±
0.3kgf•cm (Screw
3
)
• Screw Torque: 1.0
±
0.3kgf•cm (Screw
4
,
5
)
Switch PCB Ass'y
2
4
Rack Feed Ass'y
Gear Feed
5
Fig. 2-7-A
Traverse Ass'y
5
1
NOTE
1. When installing the Rack Feed Ass'y, push both ends to
2. In case of the Gear Motor installation, check if the value
3. When installing the wire of the Switch PCB Ass'y, install
4. After the assembly of the Traverse Ass'y, hook the wire
align the teeth as shown Fig. 2-7-B. Then install it.
of the Fig. 2-7-C is correct.
it correctly as Fig. 2-7-D.
Manual soldering conditions
• Soldering temperature: 320
±
20˚C
• Soldering time: Within 3 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
on the Traverse Ass'y as shown Fig. 2-7-E.
[OK]
[NG]
Fig. 2-7-B
Rack Feed Ass'y
Push
Push
Fig. 2-7-C
8.0
±
0.2mm
Safety surface for pressing
of the insert.
Feed Motor
Gear Motor
Check Lock
Pickup leneses
GEM1004
GED-008
Содержание DV-600AV-K
Страница 17: ...DV 600AV S 17 5 6 7 8 5 6 7 8 C D F A B E ...