34
DV-310-S
1
2
3
4
A
B
C
D
E
F
1
2
3
4
Holder Traverse
Insulator (F)
Traverse Ass'y
Insulator (F)
Insulator (R)
NOTE
1. In case of the Clamper Ass'y installation, install correctly
as Fig. 2-5-B.
Fig. 2-5-B
Plate Clamper
Clamper
2-6: HOLDER TRAVERSE/INSULATOR (F)/INSULATOR
1. Remove the Holder Traverse.
2. Remove the 2 Insulator (F).
3. Remove the Insulator (R).
Fig. 2-6-A
(R) (Refer to Fi
g
. 2-6-A)
NOTE
1. In case of the Insulator (F) installation, install correctly
as Fig. 2-6-B.
Fig. 2-6-B
Traverse Holder
Insulator (F)
2-7: SWITCH PCB ASS'Y/GEAR MIDDLE/GEAR FEED/
RACK FEED ASS'Y/FEED MOTOR
(Refer to Fi
g
. 2-7-A)
1. Unlock the support
1
.
2. Remove the Gear Middle.
3. Remove the screw
2
.
4. Remove the Rack Feed Ass'y.
5. Remove the screw
3
.
6. Remove the Switch PCB Ass'y.
7. Remove the screw
4
.
8
. Remove the Gear Feed.
9. Remove the 2 screws
5
.
10. Remove the Feed Motor.
11. Remove the Gear Motor.
3
Gear Middle
Gear Motor
Feed Motor
• Screw Torque: 1.3
±
0.3kgf•cm (Screw
2
)
• Screw Torque: 3.0
±
0.3kgf•cm (Screw
3
)
• Screw Torque: 1.0
±
0.3kgf•cm (Screw
4
,
5
)
Switch PCB Ass'y
2
4
Rack Feed Ass'y
Gear Feed
5
Fig. 2-7-A
Traverse Ass'y
5
1
NOTE
1.
W
hen installing the Rack Feed Ass'y, push both ends to
2. In case of the Gear Motor installation, check if the value
3.
W
hen installing the wire of the Switch PCB Ass'y, install
4. After the assembly of the Traverse Ass'y, hook the wire
align the teeth as shown Fig. 2-7-B. Then install it.
of the Fig. 2-7-C is correct.
it correctly as Fig. 2-7-D.
Manual soldering conditions
• Soldering temperature: 320
±
20°C
• Soldering time:
W
ithin 3 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
on the Traverse Ass'y as shown Fig. 2-7-E.
[OK]
[NG]
Fig. 2-7-B
Rack Feed Ass'y
Push
Push
Fig. 2-7-C
8
.0
±
0.2mm
Safety surface for pressing
of the insert.
Feed Motor
Gear Motor
Check Lock
Pickup leneses
GEM1004
GED-00
8