33
DV-310-S
5
6
7
8
5
6
7
8
A
B
C
D
E
F
BRO
WN
(1)
W
HITE (2)
NOTE
1. In case of the Pulley Motor installation, check if the value
2.
W
hen installing the wire of the Loading Motor PCB Ass'y,
3.
W
hen installing the Loading Motor PCB Ass'y, install it
4. In case of the Loading Motor PCB Ass'y installation, hook
of the Fig. 2-3-B is correct.
install it correctly as Fig. 2-3-C.
Manual soldering conditions
• Soldering temperature: 320
±
20°C
• Soldering time:
W
ithin 3 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
correctly as Fig. 2-3-D.
the wire on the Loader Sub Ass'y as shown Fig. 2-3-E.
Fig. 2-3-B
7.0 0.1mm
Safety surface for pressing
of the insert.
Loading Motor
Pulley Motor
Check Hook
Loading Motor PCB Ass’y
Loading Motor PCB Ass’y
Fig. 2-3-C
Fig. 2-3-E
Check Hook
Fig. 2-3-D
Rack Loading
B
A
The Lever should be position
between A and B.
Check Hook
Rack Loading
1
Loader Sub Ass’y
Gear Main
2-4: RACK LOADING/MAIN GEAR/PULLEY GEAR
(Refer to Fi
g
. 2-4-A)
1. Unlock the support
2
and remove the Gear Pulley.
2. Remove the Gear Main.
3. Press down the catcher
1
and slide the Rack Loading.
Gear Pulley
2
Fig. 2-4-A
NOTE
1. In case of the Rack Loading installation, hook the Rack
2.
W
hen installing the Gear Main, take care the direction of
Loading on the Loader Sub Ass'y as shown Fig. 2-4-B.
up or down as shown Fig. 2-4-C.
Fig. 2-4-B
Rack Loading
Check Hook
Fig. 2-4-C
Main Gear
Up Side
Down Side
2-5: CLAMPER ASS'Y (Refer to Fi
g
. 2-5-A)
clockwise, then unlock the 3 supports
1
.
1. Press the Clamper and rotate the Plate Clamper
2. Remove the Plate Clamper, Magnet Clamper and
Clamper.
Plate Clamper
Magnet Clamper
Fig. 2-5-A
Main Frame
Clamper
1
1
1
Loader Sub Ass'y (Bottom Side)