AVH-X7700BT/XNUC
73
5
6
7
8
5
6
7
8
C
D
F
A
B
E
1. Apply the main shaft holddown spring to the temporary applying part of CRG chassis.
2. Remove the CRG motor ASS'Y following “How to remove the CRG motor ASS'Y”.
3. Remove the retainer plate spring of the main shaft.
4. While holding up the tip of the pickup rack, slide the main shaft and remove the PU unit.
(Caution) When you attach the PU again, carry out the adjustment surely following the description in the
service manual of the mounted product.
Be sure to carry out the actual applying of main shaft holddown spring.
PU unit
Sub shaft
Main shaft
Fig. 4
Actual applying
Temporary applying
Temporary applying part of CRG chassis
Main shaft holddown spring
Retainer plate spring
Содержание AVH-X7700BT/XNEW5
Страница 81: ...AVH X7700BT XNUC 81 5 6 7 8 5 6 7 8 C D F A B E ...
Страница 85: ...AVH X7700BT XNUC 85 5 6 7 8 5 6 7 8 C D F A B E ...
Страница 88: ...AVH X7700BT XNUC 88 1 2 3 4 1 2 3 4 C D F A B E 9 3 EXTERIOR 2 Main PCB Unit A B B D D E E F A C C B F ...
Страница 90: ...AVH X7700BT XNUC 90 1 2 3 4 1 2 3 4 C D F A B E 9 4 EXTERIOR 3 B A A A B C C D D E E X7750TV XNRD ...
Страница 105: ...AVH X7700BT XNUC 105 5 6 7 8 5 6 7 8 C D F A B E ...
Страница 117: ...AVH X7700BT XNUC 117 5 6 7 8 5 6 7 8 C D F A B E ...
Страница 123: ...AVH X7700BT XNUC 123 5 6 7 8 5 6 7 8 C D F A B E ...
Страница 143: ...AVH X7700BT XNUC 143 5 6 7 8 5 6 7 8 C D F A B E ...
Страница 156: ...AVH X7700BT XNUC 156 1 2 3 4 1 2 3 4 C D F A B E B B MONITOR UNIT 70 80 90 100 110 120 130 140 150 ...