Страница 1: ...24 rev 10 PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442 USER S G U I D E PINNIUM s r o Residence Za Pazdernou 2573 8 397 01 P sek EU VAT No CZ10901442 Contact pinniu...

Страница 2: ...JACKIE L USER S GUIDE Edition 24 January 2022 2 28 Ev n 2 20220124 rev 10 PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442...

Страница 3: ...intain and evaluate the risks that may arise during operation of the Tool If you are not sure that you understood the information correctly or have questions about its usage contact us using the conta...

Страница 4: ...JACKIE L USER S GUIDE Edition 24 January 2022 4 28 Ev n 2 20220124 rev 10 PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442...

Страница 5: ...Y REGULATION DIN EN 336 2013 12 10 5 5 LIFTING STEPS qUICK OVERVIEW 11 5 6 WALL LIFTING TECHNIQUE FROM HORIZONTAL POSITION 12 5 7 WALL RELEASING FROM THE LIFTING TOOL 19 5 8 NUMBER OF LIFTING TOOLS RE...

Страница 6: ...JACKIE L USER S GUIDE Edition 24 January 2022 6 28 Ev n 2 20220124 rev 10 PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442...

Страница 7: ...user s guide and being sure you understood correctly all the content Keep this manual for future utilization Pay special attention to the safety instructions Failure to observe the safety rules may ca...

Страница 8: ...ATELY AT LEAST TWO LIFTERS ARE ALWAYS NEEDED TO BE USED FOR LIFTING ONE WALL AT THE SAME TIME 5 1 TECHNICAL PARAMETERS Maximum load capacity vertical max 268 kg Dimensions without main rod 327 x 185 x...

Страница 9: ...Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442 5 2 LIFTING TOOL PARTS 5 3 TERMS USED FOR WALLS AND ITS PARTS There are described terms used for walls and its parts see Figure 3 1 Lift...

Страница 10: ...cording to DIN EN 336 2013 12 We highly recommend to use a new rising joist to lift each wall to ensure trouble free operation during the lifting ATTENTION IF DIMENSIONS OF THE RISING JOIST ARE OUT OF...

Страница 11: ...Wall horizontal position 2 Lifting the Wall using the Jackie Tool 3 Lifting tool limit 80 85 4 Securing the wall against overfall illustration 5 Lifting the wall from 85 to 90 by hand Securing the wal...

Страница 12: ...ective floor 3 OPTIONS OF WALL SECURING AT THE BOTTOM EDGE a SECURING THE BOTTOM EDGE OF THE LIFTED WALL USING DOOR HINGES Securing the wall against unwanted sliding using the door hinges is shown in...

Страница 13: ...is already fixed to the baseplate c SECURING THE BOTTOM EDGE OF THE LIFTED WALL USING ANGLED SCREWS Securing the wall against unwanted sliding is done by joining the lower plate with the bottom plate...

Страница 14: ...ns of double top plate and the wall use more lifting tools Determine the number of lifting tools according to the wall s dimensions and weight see Table 2 in Chapter 5 8 This will reduce excessive def...

Страница 15: ...h the two flaps of the Tool up to the touch with the floor 2 Put the lifting Tool together with the rising joist inserted inside on the heel Do not fix the heel to the floor yet Check whether the risi...

Страница 16: ...ool position Figure 12 between the wall studs cripples Incorrect lifting Tool position Figure 13 under the wall studs cripples Grab hold of main rod by your hand and check whether the rod is properly...

Страница 17: ...on the floor b Bottom plates are firmly fixed to the ground and secured against any movement c Lifting Tool with the rising joist and the heel are well positioned under the lifted wall and the wall is...

Страница 18: ...ing and manipulation with the lifting Tool during the remaining angle 5 10 is shown in the Chapter 5 5 and 5 7 NOTICE The lifting Tool contains two levers Main rod O and auxiliary lever P Main lifting...

Страница 19: ...sure that the length of the rising joist is sufficient and the joist has a necessary overlap as it is shown at Figure 18 c Get the wall into the vertical position eventually check the verticality usin...

Страница 20: ...T kg WITH SHEATING DISTANCE FROM WALL ENDS MAX m DISTANCE BETWEEN LIFTERS MAX m NONE kg 15 mm OSB desk kg 60 mm WFB or 12 5 mm PFB kg 100 mm WFB kg A B C 140 4 200 285 370 483 1 0 3 00 160 250 340 430...

Страница 21: ...RECOMMENDED LIFTING TOOL POSITIONS FOR SEVERAL WALLS DIMENSIONS Each position of the Lifting Tool below can be considered as a position for workers also Therefore at least two workers are always requi...

Страница 22: ...aintain a sufficient distance to ensure their own safety Make sure that the load does not come into contact with other obstacles Do not place multiple loads on the Lifting Tool at once Do not allow th...

Страница 23: ...n the construction site such as goggles hearing protection helmets safety shoes etc Never perform maintenance while the Tool is in use Do not overload the Tool or any accessories If you notice any unu...

Страница 24: ...to their use Demonstrably unprofessional use of the goods in contradiction with the operating instructions Arbitrarily unauthorized done modifications to the Tool and its Equipment Mechanical damage c...

Страница 25: ...JACKIE L USER S GUIDE Edition 24 January 2022 25 28 Ev n 2 20220124 rev 10 PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442 9 EC DECLARATION OF CONFORMITY...

Страница 26: ...JACKIE L USER S GUIDE Edition 24 January 2022 26 28 Ev n 2 20220124 rev 10 PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442 NOTES...

Страница 27: ...JACKIE L USER S GUIDE Edition 24 January 2022 27 28 Ev n 2 20220124 rev 10 PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442...

Страница 28: ...PINNIUM s r o Za Pazdernou 2573 397 01 P sek CIN 109 01 442 EU VAT No CZ10901442...