![Pinnacle Treehouse Loft Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/pinnacle/treehouse-loft/treehouse-loft_assembly-manual_1557436006.webp)
Step 17: Secure 2x3s of
playhouse floor to 2x6s
with 2" deck screws,
making sure plywood is
down tight against
2x6's.
Step 18: Secure two 16" 4x4 cor-
ner braces to each corner post
underneath floor and against the
post, making sure to keep the
1/2" recessed hole towards the
post. Secure with 3/8"x 3" lag
bolts with washers at bottom.
Step 19: Secure top of
16" corner braces with
two 3" deck screws
through 2x6 floor joists
into the top of each cor-
ner brace.
Step 20: Secure 3/4" x 1-1/4" poly capping on top
of 2x6 base with 2-1/2" decking screws. Keep
screws about 2" from ends and about 18" apart.
Step 22: position 5-rung ladder at
front right opening keeping top
rung level with poly decking
(make sure that the top rung is
less than 3-1/2" away from floor to
leave no room for entrapment).
Step 23: Secure 5-rung ladder with two 3/8"x 4" lag
bolts with washers through top holes in ladder into
4x4 posts.
Step 21: Secure 28" 2x6 sand box
seat at each corner of the base.
Install two 2-1/2" deck screws
through each end of sandbox seat
through poly capping and into 2x6s
of the base. This completes the
floor and base of your play set.
© Pinnacle Play Systems
page 6