![Pinnacle Treehouse Loft Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/pinnacle/treehouse-loft/treehouse-loft_assembly-manual_1557436004.webp)
Step 7: Assemble the base by securing each corner of the base with three 2-1/2"
deck screws through the predrilled holes in the 72" front and back pieces into the
86-1/4" sides, keeping the 2 x 6's flush on the outside.
Step 8: When base is
completed stand floor
upright on its right side,
approximately 4-1/2' to
the right side of the base
with the poly decking
facing away from
base.
Step 9: Insert three 90-1/2" 4x4 posts through the front
three post holes in the poly decking; keep the larger
recessed portion of the bolt holes in the post facing
towards the back of the play set. Also keep the
chipped top end of each post facing to the right.
Step 10: When you insert posts, promptly insert 1/2"
x 4-3/4" carriage bolts through 5/8" holes in the floor
into 5/8" recessed holes in posts; line up the two
holes in floor with second set in posts, and insert
bolts.
Step 11: Install the two 54-1/2"
back posts at back corners of
your play set with the recessed
holes in the post facing towards
the front. Stand the base on the
right side as you are installing
4-3/4" carriage bolts through
the 2 x 6s in the floor and base
into the posts. The bottom
holes in the posts will line up
with the holes in the 2x6s of
the base.
© Pinnacle Play Systems
page 4