![Pinnacle Outdoor 1.5m Skillion Series Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/pinnacle-outdoor/1-5m-skillion-series/1-5m-skillion-series_assembly-instructions-manual_1557595009.webp)
9
Once the middle pre-drilled holes are fixed, holding the jambs in place you will need to drill holes through the sheet using a 3mm drill
bit to fix the jambs through the top and bottom pre-drilled holes as per diagrams below.
RIDGES FACING UP
Please note: Drill holes from the
inside of the sheet through the
pre-drilled holes in the jambs to
ensure holes line up.
Then fix jambs from the outside
of sheet ensuring the jambs are
on the inside of the sheet.
Back
S87
S87