![Pinnacle Outdoor 1.5m Skillion Series Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/pinnacle-outdoor/1-5m-skillion-series/1-5m-skillion-series_assembly-instructions-manual_1557595024.webp)
Cyclonic
Kit
1.5 x 1.5 x 2.0m
24
Step 6:
Assemble the front door
Place part D18R (door sheet) on the worktable then slide parts ZZ06 (jamb) and ZZ07 (jamb) into the sheet ridges from the top. Once
the jambs are in place, turn sheet over and drill holes through the pre-drilled holes in the jambs to ensure the holes line up. Then fix
jambs to the sheet with the provided 3.0 x 10mm rivets as per diagrams below.
Please note:
Drill holes from
the inside of the
sheet through
the pre-drilled
holes in the
jambs to ensure
holes line up.
Then fix
channels from
the outside of
sheet with the
provided 3.0 x
10mm rivets.
Back
RIDGES FACING UP
D18R
ZZ06
ZZ07