6.2
Preparing for operation
6
Commissioning
6-2
6.2
Preparing for operation
6200
Preparing for operation
6-
6.2.1
Download modified project to the PNOZmulti safety system
Download modified project to the PNOZmulti safety system
6-
Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA
As soon as an additional expansion module has been connected to the
system, the project must be amended using the PNOZmulti Configura-
tor. Proceed as described in the operating instructions for the base unit.
6.2.2
Connection
Connection
6-
Betriebsbereitschaft herstellen
Supply voltage
Connection examples for the input circuit
NOTICE
For the commissioning and after every program change, you
must check whether the safety devices are functioning correctly.
Supply voltage
DC
Input circuit
Single-channel
Dual-channel
Example:
E-STOP
without detection of shorts across
contacts
Example:
E-STOP
with detection of shorts across con-
tacts
24 V
+ 24 V DC
0 V
0 V
S1
I0
L+
I0
T0
S1
S1
T1
I1
T0
I0
Содержание PNOZ m EF 8DI4DO
Страница 8: ...1 Introduction 1 4...
Страница 14: ...3 Safety 3 4...
Страница 16: ...4 Function description 4 2...
Страница 18: ...5 2 Dimensions 5 Installation 5 2 5 2 Dimensions 5200 Dimensions 5 Abmessungen 22 5 0 88...
Страница 20: ...5 Installation 5 4...
Страница 24: ...6 Commissioning 6 4...
Страница 26: ...7 Operation 7 2...
Страница 32: ...8 Technical details 8 6...