TIME LIMITED INSPECTION REQUIREMENTS
SCHEDULED INSPECTIONS
Table of Contents
Page
TIME LIMITED INSPECTION REQUIREMENTS - SCHEDULED INSPECTIONS....................
Index of Tables
Page
1
2
3
4
5
6
7
- Time Limited Inspection Requirements - RVSM Aircraft......................................
8
References
Table 1 References
Data module/Technical publication
Title
12-B-12-20-06-00A-902A-A
WHEEL BEARING - SERVICING
12-B-20-40-00-00A-901A-A
CORROSION CONTROL - MAINTENANCE PRACTICES
12-B-21-30-00-00A-903A-A
PRESSURIZATION CONTROL (MSN 1001 - 1719) - ADJUST-
MENT/TEST
12-B-21-30-02-00A-250A-A
SAFETY VALVE - CLEAN
12-B-21-30-05-00A-310A-A
NEGATIVE PRESSURE RELIEF VALVE - EXAMINE
12-B-21-40-06-00A-903A-A
OVERTEMPERATURE SWITCH - ADJUSTMENT/TEST
12-B-21-50-01-00A-903A-A
VAPOUR CYCLE COOLING SYSTEM - ADJUSTMENT/TEST
12-B-21-50-03-00A-313A-A
COMPRESSOR DRIVE MOTOR - INSPECTION/CHECK
12-B-21-60-05-00A-903A-A
DUCT OVERTEMPERATURE SWITCH - ADJUST-
MENT/TEST
12-B-24-30-07-00A-920A-A
LEAD ACID BATTERY - REMOVAL/INSTALLATION
12-B-24-30-07-00A-920B-A
NI-CAD BATTERY - REMOVAL/INSTALLATION
12-B-24-30-07-00A-920C-A
HEATED NI-CAD BATTERY - REMOVAL/INSTALLATION
12-B-24-52-51-00A-920A-A
EMERGENCY POWER SUPPLY (EPS) SYSTEM - REMOV-
AL/INSTALLATION
12-B-25-21-03-00A-920A-A
EXECUTIVE TRIM - REMOVAL INSTALLATION
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-10-20-00A-281A-A
UNCLASSIFIED
2021-12-04 Page 1