7.3 - CHECKS BEFORE INSTALLATION
the installation site must be suitable for the safe use of the equipment.
the equipment installation area must have lighting that guarantees the operator good visibility during the installation phas-
es.
Before installation, it must be ensured that:
• the installation compartment meets the provisions in force on safety and is away from any possible damage of me-
chanical origin, away from sources of heat or naked flames, in a dry place and protected from external agents;
• the utilities on the customer side are closed;
• there are no impediments that could hinder the installer's installation operations;
• the upstream and downstream pipes are at the same level and can bear the weight of the equipment;
• there are no stresses on the connections;
• the inlet and outlet connections of the equipment are clean and have not been damaged;
• mechanical stresses on the inlet and outlet connections are totally absent.
Installation
Operator qualification
• installer.
PPE required
WARNING!
The PPE listed in this table is related to the risk associated with the equipment.
For the PPE required to protect against risks associated with the workplace,
installation or operating conditions, please refer to:
• the regulations in force in the country of installation;
• any information provided by the Safety Manager at the installation facility.
Equipment
required
Keys to fix inlet and outlet connections fittings/equipment.
Tab. 7.45.