INSTALLATION
1. During the installation manipulate the tools and shower column with
great care to avoid damages and scratches. Shut off the water at the
main before starting the installation.
2. Step 1 is to connect the shower head to the body of the
column. Simply pass the water supply through the hole and
then fi x the head by means of 4 nuts and bolts supplied in
your assembly kit. Connect the shower head water supply
to the respective connector on the rough inside the column.
3. We recommend to install the column at 33” (83.8 cm) from the lever
handle (thermostatic valve) to the fl oor. Determine if the height is
suitable and appropriate for yourself and the other users.
4. Install the water lines at 30” (76.2 cm) from the fl oor and leave a
gap of 4“ (10.2 cm) between the hot and cold water line. Use 1/2“
diameter pipe with 90° 1/2“ male adaptor (adaptors not included).
5. On the back of the shower column, where the water supply line
comes out of the wall, it is important to seal the space between the
ceramic and the pipe with silicone to prevent water seepage into the
wall.
6. Install each wall bracket at the desired height. Use a pencil and a
leveller before drilling each hole, then install the two brackets. (your
wall structure may require additional anchors and screws.) Please
make sure the bottom brackets don’t interfere with the supply lines.
7. Connect the hot and cold fl exible stainless steel hoses to the water
adaptors previously installed on your water supply line and slide
the shower column in place. Do not replace the fl exibles for it will
automatically void your warranty.
8. Turn on the main water supply line and check carefully for leaks
*****Apply a few thin spots of lear silicone on each side
of the shower column to secure it in place.*****
Note :
Be careful not to squeeze the two stainless
steel fl exible hoses during the repositioning so
as not to damage them or restrict the water fl ow.
Page 4
Содержание Aquamassage PD-890
Страница 1: ...Owner s manual PD 890 PD 890...
Страница 8: ......