30
STEP 5
Operating The Coating System
Stop the pump and brushes and push back into the pipe to visually verify the coating
has covered all required areas evenly. Repeat this process in 1m / 3 ft sections until
the pipe is fully coated.
STEP 6
Average coat thickness is 0.7 to 0.8 mm. Carefully inspect that the resin covers the pipe
everywhere. Be especially careful around bends.
STEP 7
Once first coat is complete, apply heat after 20 minutes (Picote Heater) to the pipe before
starting the next coat to speed up dry time.
Please have a look at page 36 for more information about additional coats.