SPI-14/18-2150
7
Rev. 06/03
Ph: 800-421-6511
www.picomacom.com
Installation Pr
ocedure
Installation
1
.
Connect the V-OUT and H-OUT to the appropriate polarity of the satellite IF distribution system.
2.
Connect the PWR TO H-LNB and PWR TO V-LNB to the LNB.
3.
Verify the voltage selector switch is in the correct position 13/14~17/18 for DBS operation or 17/18~17/18 for C/ku band operation.
4.
Insert the 3.5mm power adaptor connector into the SPI-14/18-2150. Plug the AC wall adaptor into a polarized wall receptacle.
SPI-14/18-2150 Manual.qxd 10/20/03 9:34 AM Page 7