5 Installation
P763 Nanopositioner
PZ258E
Version: 1.1.0
21
Center of load at an unsuitable position:
Figure 6: Tall load and center of load too far above the platform
Figure 7: Unwanted lever effect and center of load on the side of the platform
Requirements
You have read and understood the general notes on installation (p. 15).
The P-763 is
not
connected to the electronics.
Tools and accessories
Screws of suitable size and length (p. 35)
Suitable screwdriver
Fixing the Load
1.
Align the load on the P-763 so that the mounting holes in the load and the holes in the
platform are in line.
2.
Hold the load so that it cannot move while tightening the screws.
3.
Fix the load by tightening the screws in the mounting holes (p. 35) provided. Do not
exceed the maximum torque while tightening the screws:
−
Maximum torque on the platform: 100 Ncm
−
Torque range (p. 36) for the screws
4.
Check that the load is sitting firmly on the platform.