4. Make sure that the contact resistance is <0.1
Ω
at 25 A at all connection points relevant for
attaching the protective earth conductor.
6.3
Mounting the Load onto the L-417.xx9211E1B
Overview
Figure 6: Mounting the load onto the L-417.xx9211E1B
1. Screws
2. Load
3. Motion platform of the L-417.xx9211E1B
Tools and Accessories
■
At least 3 screws with suitable
dimensions (p. 32)
■
Suitable tool for tightening the screws
■
Optional: 2 suitably dimensioned dowel pins as locating pins for aligning the load on the
L-417.xx9211E1B
Requirements
✓
You have read and understood the
general safety instructions (p. 7)
.
✓
You have mounted the L-417.xx9211E1B
on the surface (p. 14)
properly.
✓
The L-417.xx9211E1B is not connected to the electronics.
✓
You have prepared the load so that it can be fixed to the mounting holes on the motion
platform:
■
The distance between the center of gravity of the load and the center of the motion
platform is as small as possible in all directions.
■
At least three points are provided for fixing the load on the motion platform.
6 INSTALLATION
L417M0017EN
‒
5/20/2019
17
M O T I O N | P O S I T I O N I N G