11. USEFUL LINKS &
RESOURCES
General Support
LC Magna Resource Hub
LC Magna Installation Guide
Cure L2 Installation Guide
Cure L2 Manual
Air Wash L Installation Guide
Air Wash L Manual
Photocentric Studio Support Page.
Download the latest version of Studio & read through
the software guide
Best Practices for Supporting- Guidelines for
supporting your part in Photocentric Studio
Daylight Resin & Resin Cleaner Technical Data.
Contains Technical Data Sheets that give information
on material properties, wash, and cure times, as
well as Safety Data Sheets that list important safety
information.
General Printing Troubleshooting
LC Magna Support Hub- Maintenance
3D Store
MAGNA
Liquid Crystal
MAGNA
Liquid Crystal
21
10.3 GENERAL MAINTENANCE
*Vat film may need to be replaced sooner in the case of damage or piercing or becomes too loose
Task
Frequency
Reference
Inspect print platform
Before each print
Inspection: Section 6 Cleaning: Section 9.2
Inspect LCD screen protector Before each print
Inspection: Section 6
Inspect vat film
Before each print
Inspection: Section 6
Reskin (Replace) vat film
Approx. after 20 prints*
Vat reskinning: Section 10.1
Pre-Print Preventative Maintenance
NOTE:
*LCD screen protector may need be changed earlier if there are excessive scratches. If the LCD screen
protector is ever pierced, it should be replaced
immediately.
Task
Frequency
Reference
Test Blow-Peel functionality
Weekly
Magna Resource Hub
Test LEDs and LCD screen
functionality
Weekly
Magna Resource Hub
Inspect vat film
Before each print
Inspection: Section 6
Reskin (Replace) vat film
Approx. after 20 prints*
Vat reskinning:
Section 10.1
Clean fan filters
Monthly
Magna Resource Hub
Check torque on Z-Axis
carriage bolts
Monthly
Magna Resource Hub
Check ball screw and rails for
signs of oxidation
Bi-Monthly
Magna Resource Hub
Replace LCD screen protector Every 3 to 6 months*
Magna Resource Hub
Re-homing Z-Axis arm and
build plate
-
Photocentric Technical Support for details
Planned Maintenance
22